River Park, developer imageParkside Residence, developer image
  1. Home
  2. Compare
  3. Bangsar
  4. River Park vs Parkside Residence

River Park vs Parkside Residence

Two new launches in Bangsar, side by side on the same facts.

River Park from
RM 604,000
Parkside Residence from
RM 665,000
River Park to KJ18 Kerinchi
15 min walk
Parkside Residence to KJ16 Bangsar
7 min walk

The short answer.

Short answer: River Park starts about 9% lower. Both sit in Bangsar, and the details follow.

For the latest price list and available units, WhatsApp +60 10-827 8932.

Same facts, same order.

Developer list prices and figures from the project records. Walking times follow OpenStreetMap routes at 80 m a minute; other distances are straight-line.

River Park and Parkside Residence, side by side
FactRiver ParkParkside Residence
DeveloperMaltonSP Setia & Mitsui Fudosan
AddressBangsar South, Bangsar, MalaysiaBangsar, Bangsar, Malaysia
TenureLeaseholdLeasehold
Land titleResidential under HDACommercial under HDA
Property typeCondominiumCondominium
Pricefrom RM 604,000 to RM 1,291,200from RM 665,000 to RM 2,070,000
Built-up812-1,180 sq ft485-1,325 sq ft
Asking psf (developer)RM 799RM 1,450–1,600
Bedrooms2-31-3
Total units1332693
Blocks / floors—62
Maintenance feeRM 0.352 psf (inclusive sinking fund)RM0.50 psf (incl. 10% sinking fund)
CompletionUnder Construction Q3 2026New Launch Q2 2029
Nearest station (walk)KJ18 Kerinchi: 0.91 km straight-line, about 15 min on foot (estimate)KJ16 Bangsar: 0.45 km straight-line, about 7 min on foot (estimate)

Prices are developer list prices and change with each release. Station distances are straight-line unless a walking time is given.

Project data updated 2026-06-11Walking routes from OpenStreetMap

Where each one comes out ahead.

Worked out from the numbers above, one line per figure that differs. No figure is weighted; you decide which ones matter.

Where River Park wins

  • Lower starting price: RM 604,000, RM 61,000 (about 9%) below RM 665,000.
  • Lower asking price per sq ft: from RM 799 against RM 1,450.
  • Earlier expected completion: 2026 against 2030.
  • Lower listed maintenance rate: RM 0.352 psf (inclusive sinking fund), against RM0.50 psf (incl. 10% sinking fund). Check what each figure includes.

Where Parkside Residence wins

  • Smaller entry layout: from 485 sq ft against 812 sq ft.
  • Larger biggest layout: 1,325 sq ft against 1,180 sq ft.
  • Fewer homes: 693 units against 1,332.
  • Shorter walk to rail: 7 min to KJ16 Bangsar against 15 min to KJ18 Kerinchi (walking routes or straight-line estimates).

What actually differs

  • River Park starts lower, at RM 604,000 against RM 665,000.
  • Land title differs: River Park is residential under HDA, Parkside Residence is commercial under HDA. Residential title is billed at domestic utility rates.
  • River Park has the lower monthly charge, at RM 0.352 psf (inclusive sinking fund).
  • Parkside Residence goes larger, up to 1,325 sq ft.
  • Parkside Residence is the smaller community, at 693 units.
  • River Park completes earlier, in 2026.

Point by point.

If budget decides it, River Park is the cheaper way in, listed from RM 604,000; Parkside Residence begins RM 61,000 higher, about 9% more.

At the top end, Parkside Residence reaches higher, up to RM 2,070,000.

Parkside Residence goes larger, up to 1,325 sq ft, while River Park covers 812 to 1,180 sq ft.

Tenure is the same: both are leasehold.

As for when you get keys, River Park is under construction, with completion expected in 2026, while Parkside Residence is new launch, with completion expected in 2030.

Bedrooms run 2 to 3 at River Park and 1 to 3 at Parkside Residence.

Unit count: 1,332 at River Park, 693 at Parkside Residence.

For running costs, River Park lists RM 0.352 psf (inclusive sinking fund) while Parkside Residence lists RM0.50 psf (incl. 10% sinking fund).

For rail, River Park has not measured and Parkside Residence has Bangsar (about 0.47 km); these are straight-line figures, not walking routes.

Which suits whom

  • Buyers who want the lower entry priceRiver Park
  • Families who need more floor areaParkside Residence
  • Buyers who prefer fewer neighboursParkside Residence
  • Buyers watching the monthly chargeRiver Park

What to check before choosing

  • Ask how far construction has gone at River Park and Parkside Residence, and how that compares with the expected completion.
  • Lease term: River Park and Parkside Residence are leasehold, so confirm how many years remain on the title.
  • Car parks: confirm the number and location of bays for the exact unit, in writing.
  • Work out the monthly maintenance for your actual unit size; a small gap per sq ft adds up on a larger layout.
  • Price list: list prices change with each release, so ask for the current list and the price of the specific unit.
  • Foreign buyers: a purchase in KL needs consent from the land authority, so allow time for it in your plan.
Work out stamp duty and legal fees

Which one I would point you to.

On holding cost, River Park is the lighter one at RM 0.352 psf (inclusive sinking fund) against RM0.50 psf (incl. 10% sinking fund); on a 1,000 sq ft unit that difference runs to a few hundred ringgit a month, every month. Parkside Residence is the quieter building at 693 units against 1,332, which shows up in lift waits and how busy the facilities feel. River Park has the lower entry price at RM 604,000, though the layout you end up choosing matters more than the headline figure. Either way, ask for the current price list and walk both before you decide — I can arrange that.

Written by

Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd

Arrange both viewings on WhatsApp

Questions, answered from the record.

How far apart are the starting prices of River Park and Parkside Residence?

River Park is listed from RM 604,000 and Parkside Residence from RM 665,000, a difference of RM 61,000 or about 9%. Price lists change with each release.

Which one is closer to a train station?

River Park: not measured. Parkside Residence: Bangsar, about 0.47 km. Both are straight-line distances.

What are the tenure and completion of each?

River Park: leasehold, under construction, with completion expected in 2026. Parkside Residence: leasehold, new launch, with completion expected in 2030.

What costs come on top of the price?

Stamp duty on the transfer, and if you take a loan, stamp duty on the loan agreement at 0.5% of your loan. Legal fees are separate. Foreign buyers in KL also need consent from the land authority.

Data last updated: 2026-06-11. Station distances are straight-line; prices are developer list prices and change with each release.

Both price lists, one viewing day.Ask on WhatsApp.

You get the current price list for each project, the latest offers and back-to-back viewings at both sales galleries. Enquiries and viewings: Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd.

  • Both price listsEvery layout in both projects
  • Floor plans2-3 and 1-3 bedrooms
  • Two viewings, one dayBoth are in Bangsar