Two new launches in Bangsar, side by side on the same facts.
Both projects are in Bangsar. What separates them most is that Parkside Residence starts about 20% lower, Bangsar Hill Park – Verdura (Tower D and E) is already completed and Parkside Residence is nearer a station. The breakdown is below.
For the latest price list and available units, WhatsApp +60 10-827 8932.
Developer list prices and figures from the project records. Walking times follow OpenStreetMap routes at 80 m a minute; other distances are straight-line.
| Fact | Parkside Residence | Bangsar Hill Park – Verdura (Tower D and E) |
|---|---|---|
| Developer | SP Setia & Mitsui Fudosan | Bangsar Hill Park Development Sdn Bhd |
| Address | Bangsar, Bangsar, Malaysia | Lorong Maarof, Bangsar, Kuala Lumpur |
| Tenure | Leasehold | Leasehold |
| Land title | Commercial under HDA | Residential under HDA |
| Property type | Condominium | Condominium |
| Price | from RM 665,000 to RM 2,070,000 | from RM 835,000 to RM 1,599,000 |
| Built-up | 485-1,325 sq ft | 917-1,478 sq ft |
| Asking psf (developer) | RM 1,450–1,600 | RM 911 |
| Bedrooms | 1-3 | 2-3 |
| Total units | 693 | 812 |
| Blocks / floors | 62 | 2 / 57 |
| Car parks | — | 1-2 |
| Maintenance fee | RM0.50 psf (incl. 10% sinking fund) | Estimated to be RM0.35 psf per month excluding sinking fund |
| Completion | New Launch Q2 2029 | Completed 2025 |
| Nearest station (walk) | KJ16 Bangsar: 0.45 km straight-line, about 7 min on foot (estimate) | KJ16 Bangsar: 0.37 km straight-line, about 6 min on foot (estimate) |
Prices are developer list prices and change with each release. Station distances are straight-line unless a walking time is given.
Project data updated 2026-06-11Walking routes from OpenStreetMap
Worked out from the numbers above, one line per figure that differs. No figure is weighted; you decide which ones matter.
Both asking ranges on one scale with the median of recorded resale high-rise sales around them. A new launch and a completed resale home are different products.
Resale figures are medians of recorded sales of completed high-rise homes; they are not valuations of either project. Medians only. The two projects sit in different resale localities; the first one on record is shown.
Resale = NAPIC open transaction data (Data Transaksi Terbuka): recorded transactions of completed homes, medians only. Asking = developer price lists on record.
Project data updated 2026-06-11Transactions checked 4 Oct 2026
On entry price, Parkside Residence starts at RM 665,000 and Bangsar Hill Park – Verdura (Tower D and E) at RM 835,000, a gap of RM 170,000 or about 20%.
At the top end, Parkside Residence reaches higher, up to RM 2,070,000.
For space, compare 485 to 1,325 sq ft (Parkside Residence) with 917 to 1,478 sq ft (Bangsar Hill Park – Verdura (Tower D and E)); the smallest layout is not necessarily the cheapest unit.
There is no tenure difference here; each is leasehold.
On timing, Parkside Residence is new launch, with completion expected in 2030 and Bangsar Hill Park – Verdura (Tower D and E) is completed (2025).
Parkside Residence offers 1 to 3 bedrooms; Bangsar Hill Park – Verdura (Tower D and E) offers 2 to 3.
In scale, Parkside Residence has 693 units and Bangsar Hill Park – Verdura (Tower D and E) has 812.
For running costs, Parkside Residence lists RM0.50 psf (incl. 10% sinking fund) while Bangsar Hill Park – Verdura (Tower D and E) lists Estimated to be RM0.35 psf per month excluding sinking fund.
Car parks: Bangsar Hill Park – Verdura (Tower D and E) lists 1-2 per unit; Parkside Residence does not state a figure, so ask for the allocation of the exact unit.
The nearest station is Bangsar (about 0.47 km) for Parkside Residence and Bangsar (about 0.60 km) for Bangsar Hill Park – Verdura (Tower D and E), measured in a straight line, so the walk is longer.
If you want to move in now, Bangsar Hill Park – Verdura (Tower D and E) is the one to see: it is finished, so you can walk the actual unit rather than judge it from a plan. Parkside Residence is still under construction, completing Q2 2029, which only suits you if the wait is not a problem. On holding cost, Bangsar Hill Park – Verdura (Tower D and E) is the lighter one at Estimated to be RM0.35 psf per month excluding sinking fund against RM0.50 psf (incl. 10% sinking fund); on a 1,000 sq ft unit that difference runs to a few hundred ringgit a month, every month. Parkside Residence is the quieter building at 693 units against 812, which shows up in lift waits and how busy the facilities feel. Either way, ask for the current price list and walk both before you decide — I can arrange that.
Parkside Residence is listed from RM 665,000 and Bangsar Hill Park – Verdura (Tower D and E) from RM 835,000, a difference of RM 170,000 or about 20%. Price lists change with each release.
Parkside Residence: Bangsar, about 0.47 km. Bangsar Hill Park – Verdura (Tower D and E): Bangsar, about 0.60 km. Both are straight-line distances.
Parkside Residence: leasehold, new launch, with completion expected in 2030. Bangsar Hill Park – Verdura (Tower D and E): leasehold, completed (2025).
Stamp duty on the transfer, and if you take a loan, stamp duty on the loan agreement at 0.5% of your loan. Legal fees are separate. Foreign buyers in KL also need consent from the land authority.
Data last updated: 2026-06-11. Station distances are straight-line; prices are developer list prices and change with each release.
You get the current price list for each project, the latest offers and back-to-back viewings at both sales galleries. Enquiries and viewings: Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd.
WhatsApp +60 10-827 8932