Bangsar Hill Park – Verdura (Tower D and E), developer imageBangsar Hill Park – Tower B and C, developer image
  1. Home
  2. Compare
  3. Bangsar
  4. Bangsar Hill Park – Verdura (Tower D and E) vs Bangsar Hill Park – Tower B and C

Bangsar Hill Park – Verdura (Tower D and E) vs Bangsar Hill Park – Tower B and C

Two new launches in Bangsar, side by side on the same facts.

Bangsar Hill Park – Verdura (Tower D and E) from
RM 835,000
Bangsar Hill Park – Tower B and C from
RM 1,123,000
Bangsar Hill Park – Verdura (Tower D and E) to KJ16 Bangsar
6 min walk
Bangsar Hill Park – Tower B and C to KJ16 Bangsar
7 min walk

The short answer.

Both projects are in Bangsar. What separates them most is that Bangsar Hill Park – Verdura (Tower D and E) starts about 26% lower and Bangsar Hill Park – Verdura (Tower D and E) is already completed. The breakdown is below.

For the latest price list and available units, WhatsApp +60 10-827 8932.

Same facts, same order.

Developer list prices and figures from the project records. Walking times follow OpenStreetMap routes at 80 m a minute; other distances are straight-line.

Bangsar Hill Park – Verdura (Tower D and E) and Bangsar Hill Park – Tower B and C, side by side
FactBangsar Hill Park – Verdura (Tower D and E)Bangsar Hill Park – Tower B and C
DeveloperBangsar Hill Park Development Sdn BhdBangsar Hill Park Development Sdn Bhd
AddressLorong Maarof, Bangsar, Kuala LumpurLorong Maarof, Bangsar, Kuala Lumpur
TenureLeaseholdLeasehold
Land titleResidential under HDAResidential
Property typeCondominiumCondominium
Pricefrom RM 835,000 to RM 1,599,000from RM 1,123,000 to RM 1,742,000
Built-up917-1,478 sq ft803-1,478 sq ft
Asking psf (developer)RM 911RM 793–1,132
Bedrooms2-32-3
Total units812802
Blocks / floors2 / 572 / 57
Car parks1-21-2
Maintenance feeEstimated to be RM0.35 psf per month excluding sinking fundRM 0.35 psf (excluding 10% sinking fund)
CompletionCompleted 2025Under Construction Est Q1 2028
Nearest station (walk)KJ16 Bangsar: 0.37 km straight-line, about 6 min on foot (estimate)KJ16 Bangsar: 0.46 km straight-line, about 7 min on foot (estimate)

Prices are developer list prices and change with each release. Station distances are straight-line unless a walking time is given.

Project data updated 2026-04-03Walking routes from OpenStreetMap

Where each one comes out ahead.

Worked out from the numbers above, one line per figure that differs. No figure is weighted; you decide which ones matter.

Where Bangsar Hill Park – Verdura (Tower D and E) wins

  • Lower starting price: RM 835,000, RM 288,000 (about 26%) below RM 1,123,000.
  • Shorter walk to rail: 6 min to KJ16 Bangsar against 7 min to KJ16 Bangsar (walking routes or straight-line estimates).
  • Earlier completion: 2025 against 2028.

Where Bangsar Hill Park – Tower B and C wins

  • Lower asking price per sq ft: from RM 793 against RM 911.
  • Smaller entry layout: from 803 sq ft against 917 sq ft.
  • Fewer homes: 802 units against 812.

What actually differs

  • Bangsar Hill Park – Verdura (Tower D and E) starts lower, at RM 835,000 against RM 1,123,000.
  • Land title differs: Bangsar Hill Park – Verdura (Tower D and E) is residential under HDA, Bangsar Hill Park – Tower B and C is residential. Residential title is billed at domestic utility rates.
  • Bangsar Hill Park – Tower B and C is the smaller community, at 802 units.
  • Bangsar Hill Park – Verdura (Tower D and E) completes earlier, in 2025.

What finished homes in Bangsar sold for.

Both asking ranges on one scale with the median of recorded resale high-rise sales around them. A new launch and a completed resale home are different products.

Bangsar Hill Park – Verdura (Tower D and E)Developer asking price, new launch

RM 911

Bangsar Hill Park – Tower B and CDeveloper asking price, new launch

RM 793–1,132

Completed schemes in BangsarResale median · 64 transactions in 14 schemes · Jan 2024 – May 2026

aboutRM 854

Resale figures are medians of recorded sales of completed high-rise homes; they are not valuations of either project. Medians only.

Resale = NAPIC open transaction data (Data Transaksi Terbuka): recorded transactions of completed homes, medians only. Asking = developer price lists on record.

Project data updated 2026-04-03Transactions checked 4 Oct 2026

Point by point.

The starting prices sit about 26% apart: RM 835,000 for Bangsar Hill Park – Verdura (Tower D and E) versus RM 1,123,000 for Bangsar Hill Park – Tower B and C, a difference of RM 288,000.

At the top end, Bangsar Hill Park – Tower B and C reaches higher, up to RM 1,742,000.

Built-up sizes run 917 to 1,478 sq ft at Bangsar Hill Park – Verdura (Tower D and E) and 803 to 1,478 sq ft at Bangsar Hill Park – Tower B and C.

There is no tenure difference here; each is leasehold.

Handover status: Bangsar Hill Park – Verdura (Tower D and E) completed (2025), Bangsar Hill Park – Tower B and C under construction, with completion expected in 2028.

Bedrooms run 2 to 3 at Bangsar Hill Park – Verdura (Tower D and E) and 2 to 3 at Bangsar Hill Park – Tower B and C.

Bangsar Hill Park – Tower B and C is the smaller community, with 802 units against 812.

Maintenance is listed at Estimated to be RM0.35 psf per month excluding sinking fund for Bangsar Hill Park – Verdura (Tower D and E) and RM 0.35 psf (excluding 10% sinking fund) for Bangsar Hill Park – Tower B and C.

Bangsar Hill Park – Verdura (Tower D and E) lists 1-2 car park(s) and Bangsar Hill Park – Tower B and C lists 1-2.

Measured in a straight line, Bangsar Hill Park – Verdura (Tower D and E) is closest to Bangsar (about 0.60 km) and Bangsar Hill Park – Tower B and C to Bangsar (about 0.60 km).

Which suits whom

  • Buyers who want the lower entry priceBangsar Hill Park – Verdura (Tower D and E)
  • Singles or couples after a compact unitBangsar Hill Park – Tower B and C
  • Buyers who want to move in soon and inspect a real unitBangsar Hill Park – Verdura (Tower D and E)

What to check before choosing

  • Ask how far construction has gone at Bangsar Hill Park – Tower B and C, and how that compares with the expected completion.
  • Lease term: Bangsar Hill Park – Verdura (Tower D and E) and Bangsar Hill Park – Tower B and C are leasehold, so confirm how many years remain on the title.
  • Car parks: confirm the number and location of bays for the exact unit, in writing.
  • Work out the monthly maintenance for your actual unit size; a small gap per sq ft adds up on a larger layout.
  • Price list: list prices change with each release, so ask for the current list and the price of the specific unit.
  • Foreign buyers: a purchase in KL needs consent from the land authority, so allow time for it in your plan.
Work out stamp duty and legal fees

Which one I would point you to.

If you want to move in now, Bangsar Hill Park – Verdura (Tower D and E) is the one to see: it is finished, so you can walk the actual unit rather than judge it from a plan. Bangsar Hill Park – Tower B and C is still under construction, completing Est Q1 2028, which only suits you if the wait is not a problem. Bangsar Hill Park – Verdura (Tower D and E) has the lower entry price at RM 835,000, though the layout you end up choosing matters more than the headline figure. Either way, ask for the current price list and walk both before you decide — I can arrange that.

Written by

Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd

Arrange both viewings on WhatsApp

Questions, answered from the record.

How far apart are the starting prices of Bangsar Hill Park – Verdura (Tower D and E) and Bangsar Hill Park – Tower B and C?

Bangsar Hill Park – Verdura (Tower D and E) is listed from RM 835,000 and Bangsar Hill Park – Tower B and C from RM 1,123,000, a difference of RM 288,000 or about 26%. Price lists change with each release.

Which one is closer to a train station?

Bangsar Hill Park – Verdura (Tower D and E): Bangsar, about 0.60 km. Bangsar Hill Park – Tower B and C: Bangsar, about 0.60 km. Both are straight-line distances.

What are the tenure and completion of each?

Bangsar Hill Park – Verdura (Tower D and E): leasehold, completed (2025). Bangsar Hill Park – Tower B and C: leasehold, under construction, with completion expected in 2028.

What costs come on top of the price?

Stamp duty on the transfer, and if you take a loan, stamp duty on the loan agreement at 0.5% of your loan. Legal fees are separate. Foreign buyers in KL also need consent from the land authority.

Data last updated: 2026-04-03. Station distances are straight-line; prices are developer list prices and change with each release.

Both price lists, one viewing day.Ask on WhatsApp.

You get the current price list for each project, the latest offers and back-to-back viewings at both sales galleries. Enquiries and viewings: Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd.

  • Both price listsEvery layout in both projects
  • Floor plans2-3 and 2-3 bedrooms
  • Two viewings, one dayBoth are in Bangsar