Two new launches in Bangsar, side by side on the same facts.
River Park and Bangsar Hill Park – Verdura (Tower D and E) are both in Bangsar. The main differences: River Park starts about 28% lower and Bangsar Hill Park – Verdura (Tower D and E) is already completed. Each point is set out below.
For the latest price list and available units, WhatsApp +60 10-827 8932.
Developer list prices and figures from the project records. Walking times follow OpenStreetMap routes at 80 m a minute; other distances are straight-line.
| Fact | River Park | Bangsar Hill Park – Verdura (Tower D and E) |
|---|---|---|
| Developer | Malton | Bangsar Hill Park Development Sdn Bhd |
| Address | Bangsar South, Bangsar, Malaysia | Lorong Maarof, Bangsar, Kuala Lumpur |
| Tenure | Leasehold | Leasehold |
| Land title | Residential under HDA | Residential under HDA |
| Property type | Condominium | Condominium |
| Price | from RM 604,000 to RM 1,291,200 | from RM 835,000 to RM 1,599,000 |
| Built-up | 812-1,180 sq ft | 917-1,478 sq ft |
| Asking psf (developer) | RM 799 | RM 911 |
| Bedrooms | 2-3 | 2-3 |
| Total units | 1332 | 812 |
| Blocks / floors | — | 2 / 57 |
| Car parks | — | 1-2 |
| Maintenance fee | RM 0.352 psf (inclusive sinking fund) | Estimated to be RM0.35 psf per month excluding sinking fund |
| Completion | Under Construction Q3 2026 | Completed 2025 |
| Nearest station (walk) | KJ18 Kerinchi: 0.91 km straight-line, about 15 min on foot (estimate) | KJ16 Bangsar: 0.37 km straight-line, about 6 min on foot (estimate) |
Prices are developer list prices and change with each release. Station distances are straight-line unless a walking time is given.
Project data updated 2026-06-11Walking routes from OpenStreetMap
Worked out from the numbers above, one line per figure that differs. No figure is weighted; you decide which ones matter.
Both asking ranges on one scale with the median of recorded resale high-rise sales around them. A new launch and a completed resale home are different products.
Resale figures are medians of recorded sales of completed high-rise homes; they are not valuations of either project. Medians only. The two projects sit in different resale localities; the first one on record is shown.
Resale = NAPIC open transaction data (Data Transaksi Terbuka): recorded transactions of completed homes, medians only. Asking = developer price lists on record.
Project data updated 2026-06-11Transactions checked 4 Oct 2026
If budget decides it, River Park is the cheaper way in, listed from RM 604,000; Bangsar Hill Park – Verdura (Tower D and E) begins RM 231,000 higher, about 28% more.
Bangsar Hill Park – Verdura (Tower D and E) has the wider price spread, topping out at RM 1,599,000.
Bangsar Hill Park – Verdura (Tower D and E) goes larger, up to 1,478 sq ft, while River Park covers 812 to 1,180 sq ft.
There is no tenure difference here; each is leasehold.
As for when you get keys, River Park is under construction, with completion expected in 2026, while Bangsar Hill Park – Verdura (Tower D and E) is completed (2025).
In room count, River Park has 2 to 3 bedrooms and Bangsar Hill Park – Verdura (Tower D and E) has 2 to 3.
Bangsar Hill Park – Verdura (Tower D and E) is the smaller community, with 812 units against 1,332.
Maintenance is listed at RM 0.352 psf (inclusive sinking fund) for River Park and Estimated to be RM0.35 psf per month excluding sinking fund for Bangsar Hill Park – Verdura (Tower D and E).
Car parks: Bangsar Hill Park – Verdura (Tower D and E) lists 1-2 per unit; River Park does not state a figure, so ask for the allocation of the exact unit.
Measured in a straight line, River Park is closest to not measured and Bangsar Hill Park – Verdura (Tower D and E) to Bangsar (about 0.60 km).
If you want to move in now, Bangsar Hill Park – Verdura (Tower D and E) is the one to see: it is finished, so you can walk the actual unit rather than judge it from a plan. River Park is still under construction, completing Q3 2026, which only suits you if the wait is not a problem. On holding cost, Bangsar Hill Park – Verdura (Tower D and E) is the lighter one at Estimated to be RM0.35 psf per month excluding sinking fund against RM 0.352 psf (inclusive sinking fund); on a 1,000 sq ft unit that difference runs to a few hundred ringgit a month, every month. Bangsar Hill Park – Verdura (Tower D and E) is the quieter building at 812 units against 1,332, which shows up in lift waits and how busy the facilities feel. Either way, ask for the current price list and walk both before you decide — I can arrange that.
River Park is listed from RM 604,000 and Bangsar Hill Park – Verdura (Tower D and E) from RM 835,000, a difference of RM 231,000 or about 28%. Price lists change with each release.
River Park: not measured. Bangsar Hill Park – Verdura (Tower D and E): Bangsar, about 0.60 km. Both are straight-line distances.
River Park: leasehold, under construction, with completion expected in 2026. Bangsar Hill Park – Verdura (Tower D and E): leasehold, completed (2025).
Stamp duty on the transfer, and if you take a loan, stamp duty on the loan agreement at 0.5% of your loan. Legal fees are separate. Foreign buyers in KL also need consent from the land authority.
Data last updated: 2026-06-11. Station distances are straight-line; prices are developer list prices and change with each release.
You get the current price list for each project, the latest offers and back-to-back viewings at both sales galleries. Enquiries and viewings: Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd.
WhatsApp +60 10-827 8932