River Park Bangsar

River Park by Malton in Bangsar, Kuala Lumpur. From RM 604,000, Leasehold Condominium with 812-1,180 sqft layouts (2-3 bedrooms). Floor plans, distance to the nearest stations and sales gallery appointments on propertyportal.my.

River Park project information

DeveloperMalton
LocationBangsar South, Bangsar, Malaysia
Property typeCondominium
TenureLeasehold
Land titleResidential under HDA
Starting priceRM 604,000
Price rangeRM 604,000 – RM 1,291,200
Built-up812-1,180 sqft
Bedrooms2-3 bedrooms
Total units1332
Maintenance feeRM 0.352 psf (inclusive sinking fund)
CompletionUnder Construction, Q3 2026

Last checked .

River Park at a glance

  • From price: RM 604,000 to RM 1,291,200
  • Asking psf: RM 799 per sq ft
  • Tenure: Leasehold
  • Completion: expected 2026
  • Units: 1,332, 47 floors, 2–3 bedrooms
  • Density: about 28 homes a floor (1,332 units ÷ 47 floors)
  • Walk to rail: 15 min to KJ18 Kerinchi (0.91 km straight-line, estimate)
  • Against other new launches in Bangsar South: -13% (median RM 920 psf of 2 projects)

River Park scorecard

Six sub-scores from 0 to 10, each with its formula and inputs. Data-based, not a recommendation; there is no overall total.

  • Price vs area: 7.6 / 10 — Lowest asking RM 799 psf vs median RM 920 psf of 2 other new launches in Bangsar South: -13%. Formula: 5 − (gap % ÷ 5), kept within 0–10. Gap = this project's lowest asking psf against the median lowest asking psf of the other new launches in the same locality (needs 2 or more). Parity = 5; every 5% cheaper adds a point.
  • Rail access: 5.0 / 10 — 15 min to KJ18 Kerinchi, 0.91 km straight-line (estimate). Formula: 10 − (walk minutes − 5) ÷ 2, kept within 0–10. Five minutes or less = 10; 25 minutes or more = 0. Walk = measured OpenStreetMap route where one exists, otherwise straight-line × 1.3 at 80 m a minute.
  • Density: 1.8 / 10 — 1,332 units ÷ 47 floors = 28.3 a floor; 26 of 144 other projects pack more. Formula: 10 × share of the portal's projects that put more homes on each floor (units ÷ floors). Fewer homes per floor scores higher.
  • Supply pressure in area: 3.7 / 10 — 19,282 incoming + planned vs 60,757 standing in Mukim Kuala Lumpur: 32%. Formula: 10 × (1 − pipeline ÷ 50%), kept within 0–10. Pipeline = condominium/apartment units under construction plus planned, as a share of the units already standing (NAPIC stock table). 0% = 10; 50% or more = 0.
  • Affordability vs district income: 7.1 / 10 — RM 604,000 ÷ (RM 10,234 × 12), W.P. Kuala Lumpur 2022: 4.9 years. Formula: 10 − 1.5 × (years − 3), kept within 0–10. Years = entry price ÷ (median monthly household income × 12) for the district (DOSM). Three years or less = 10.
  • Developer record: not scored — Not enough data on record. Formula: 10, minus 5 for each sick project, 10 for each abandoned project and 3 for each entry on the TEDUH offence list; minus 2 when TEDUH lists fewer than 2 projects (short record). Not scored until the developer is looked up on TEDUH.

Strengths

  • Trains every 4 minutes at the weekday morning peak at Kerinchi station (GTFS Static, Prasarana via data.gov.my)
  • Lowest asking psf about 13% below the median of 2 other new launches in Bangsar South (RM 799 vs RM 920)
  • 62.3% of the 1,095 condominium/apartment units launched in Mukim Kuala Lumpur from Q3 2025 to Q2 2026 were reported sold (NAPIC Table New Launches, Q2 2026)
  • Entry price is about 4.9 years of W.P. Kuala Lumpur's median household income (2022) (DOSM Household Income Survey via data.gov.my)

Watch-outs

  • Incoming and planned condominium/apartment supply equals 32% of the 60,757 units standing in Mukim Kuala Lumpur (NAPIC Residential Property Stock Table, Q2 2026)
  • About 28 homes a floor (1,332 units over 47 floors)

Where the River Park asking price sits

Asking psf midpoint RM 799, below the Kuala Lumpur new-launch median of RM 978 (68 projects on this site with an asking psf).

ProjectLowest psfHighest psf
River ParkRM 799RM 799
Laurel ResidenceRM 909RM 909
Duo Tower @ Bangsar SouthRM 1,503RM 1,503
The Goodwood ResidenceRM 930RM 930

Getting around from River Park

ToRail, door to doorCar, no traffic
KL City Centre40 min: walk 15, wait 2, train 19, walk 4; Abdullah Hukum to KLCC14 min
TRX43 min: walk 15, wait 2, train 18, 1 change, walk 3; Abdullah Hukum to Tun Razak Exchange18 min
Bangsar South16 min on foot (0.96 km)5 min
Mid Valley14 min on foot (0.84 km)7 min
Cyberjaya—34 min
Petaling Jaya SS248 min: walk 15, wait 2, train 11, walk 21; Kerinchi to Taman Paramount13 min

Nearest station: KJ18 Kerinchi (Kelana Jaya Line); about 6,616 journeys start and 6,887 end there a day (30-day average); trains every 4 minutes at the weekday morning peak.

  • Transit: KD02 Angkasapuri (0.3 km), KB02 Seputeh (0.8 km), KJ18 Kerinchi (0.91 km)
  • Schools: Madrasah Abdaiah (0.55 km), Campus Rangers International School (0.58 km), Kafa Madrasah An-Nur (0.59 km)
  • Shops: Syifa Market (0.63 km), AEON BiG (0.71 km), The Sphere (0.83 km), Mid Valley Megamall (0.84 km), The Gardens Mall (0.9 km)
  • Health: The Suisse Clinic (0.65 km), Poliklinik Dr. Azhar (0.69 km)
  • Parks: The Central Park (0.82 km), Pantai Eco Park (0.88 km)

Rail: GTFS Static and Rapid Rail ridership via data.gov.my, walk + half the peak wait + ride + 5 minutes a change. Car: OSRM on OpenStreetMap, no traffic. Places: OpenStreetMap, straight-line distance.

The market around River Park

  • Supply pipeline: about 32% (10,792 building + 8,490 planned against 60,757 condominium and apartment units standing in Mukim Kuala Lumpur, Q2 2026; NAPIC stock table)
  • Sales of new launches: 62.3% of 1,095 condominium and apartment units launched in Mukim Kuala Lumpur from Q3 2025 to Q2 2026 were reported sold (NAPIC)
  • House price index (Kuala Lumpur, high-rise): 229.8 in 2026 Q2 (preliminary), +1.5% on 2025 Q2 (NAPIC MHPI, 2010 = 100; covers all of Kuala Lumpur)
  • Price against incomes: the entry price of RM 604,000 is about 4.9 years of W.P. Kuala Lumpur's median household income (DOSM)

River Park against the nearest alternatives

The closest projects in the same area or within 15% of the entry price, on the same facts and the same scorecard.

FactRiver ParkDuo Tower @ Bangsar South
1.0 km away, same area
Laurel Residence
1.1 km away, same area
The Goodwood Residence
1.2 km away, same area
From priceRM 604,000RM 2,088,000RM 450,000RM 874,000
Asking psfRM 799RM 1,503RM 909RM 930
Built-up, sq ft812–1,1801,389–3,025495–903947–2,002
TenureLeaseholdLeaseholdLeaseholdLeasehold
CompletionUnder Construction 2026New Launch 2027Completed 2024Completed 2022
Units · floors1,332 · Tower A: 46-storey, Tower B: 47-storey, Tower C: 46-storey239 · 341,260 · 42678 · 40
Homes per floorabout 28.3about 7about 30about 16.9
Walk to rail15 min (estimate), KJ18 Kerinchi7 min, KJ18 Kerinchi14 min, KJ19 Universiti15 min, KJ19 Universiti
Price vs area /107.6—4.03.2
Rail access /105.09.05.55.0
Density /101.89.41.44.9
Supply pressure in area /103.73.73.73.7
Affordability vs district income /107.10.09.03.8
Developer record /10————
Where it winslowest asking psf (from RM 799)largest layout (3,025 sq ft); shortest walk to rail (7 min); fewest homes per floor (7.0)lowest entry price (RM 450,000)earliest completion (2022)

Who River Park suits

  • Transit commuter: Weak match (1 of 3 checks) — – 15 min walk to KJ18 Kerinchi; ✓ Trains every 4 minutes at the morning peak; – 40 min door to door to KL City Centre by rail. Rule: Walk ≤ 10 min · peak train ≤ 5 min apart · rail to KL City Centre ≤ 35 min
  • Own-stay family: Partial match (2 of 3 checks) — ✓ 3-bedroom layouts on the list (2–3); ✓ Largest layout 1,180 sq ft; – 0 schools listed within a 10-minute walk. Rule: A 3-bedroom layout on record · largest home ≥ 1,000 sq ft · a school within a 10-minute walk
  • First-home buyer: Weak match (1 of 3 checks) — ✓ Entry price is about 4.9 years of district median household income; – Smallest layout 812 sq ft, from RM 604,000; – Rail 15 min on foot. Rule: Entry price ≤ 5 years of district median income · smallest home ≤ 700 sq ft · walk to rail ≤ 10 min
  • Rental investor: Weak match (0 of 3 checks) — – 15 min walk to rail; – No 1-bedroom layout on record; – Incoming + planned supply is 32% of standing stock in the area. Rule: Walk to rail ≤ 10 min · 1-bedroom layouts on record · incoming + planned supply < 20% of stock. Rental figures are not on record.

A match is a fit with the numbers, not advice to buy.

River Park: checked facts

Analysis built 2026-10-30 from the figures on this page and public data: NAPIC, DOSM via data.gov.my, KPKT TEDUH, GTFS Static and Rapid Rail ridership via data.gov.my, OpenStreetMap and OSRM. Asking prices are not valuations.

Area and station guides

Can foreigners buy River Park?

The foreign-buyer minimum in Kuala Lumpur is RM 1,000,000 per unit. River Park is listed at RM 604,000 – RM 1,291,200, so by price only the units at RM 1,000,000 or more clear it. Price is only the first test: every foreign purchase needs consent from the land authority.

Costs on top of the River Park price

ItemOn the RM 604,000 starting price
Transfer stamp duty, Malaysian buyerRM 12,120 (1% on the first RM100,000, 2% up to RM500,000, 3% up to RM1,000,000, 4% above).
Transfer stamp duty, foreign buyerRM 80,000 on a RM 1,000,000 unit, the lowest price a foreign buyer can take here (flat 8% on residential property from 1 January 2026, for non-citizens and foreign companies; permanent residents pay the Malaysian rate)
Loan agreement stamp duty0.5% of your loan
Legal feesBought from a licensed developer: 65% of the standard scale at this price (standard: 1.25% on the first RM500,000, 1% on the next RM7,000,000), a share fixed by Table B of the Solicitors' Remuneration Order 2023; plus 8% service tax

River Park monthly maintenance fee

The stated rate is RM 0.352 psf (inclusive sinking fund). On the 812 sq ft unit that is about RM 286 a month, and about RM 415 on the 1,180 sq ft unit.

River Park compared with nearby projects

Among these 6 projects, River Park has the lowest entry price per sq ft, at RM 744.

ProjectStarting priceEntry price per sq ftSizes (sq ft)Completion
River ParkRM 604,000RM 744812–1,180Q3 2026
Bangsar Hill Park – Tower B and CRM 1,123,000RM 1,399803–1,478Est Q1 2028
Bangsar Hill Park – Verdura (Tower D and E)RM 835,000RM 911917–1,4782025
Khaya ResidenceRM 785,000RM 1,246630–1,321Q2 2029
Parkside ResidenceRM 665,000RM 1,371485–1,325Q2 2029
111 MenerungRM 1,745,000RM 1,7431,001–3,714Q1 2027

Entry price per sq ft = starting price ÷ built-up of the smallest layout; bigger layouts and higher floors give other figures.

Frequently asked questions about River Park

What is the starting price of River Park?

Developer list prices for River Park start from RM 604,000 and go up to RM 1,291,200. Prices change with each release; ask for the current price list.

Is River Park freehold or leasehold?

River Park is Leasehold under a residential under hda title, developed by Malton.

What unit sizes and layouts are available at River Park?

Built-up sizes range from 812 to 1,180 sq ft with 2 to 3 bedrooms.

How many units and floors does River Park have?

1332 units.

When will River Park be completed?

Under Construction; estimated completion Q3 2026.

What is the maintenance fee at River Park?

RM 0.352 psf (inclusive sinking fund), as quoted by the developer.

How do I view River Park or get the floor plans?

WhatsApp Yee Woei Shyan (REN 46305, IQI Realty Sdn Bhd) at +60 10-827 8932, or use the enquiry form on this page for the price list, floor plans and a sales gallery appointment.

River Park on the agent's site

River Park on shyanyee.com — the agent's write-up of this project and how it compares with nearby launches.

Enquiries and sales gallery appointments: Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd. WhatsApp +60 10-827 8932.

Other projects in Bangsar

All new launches in Bangsar

All residences · Compare projects · Buying guide · Loan calculator