ARRA, developer imageThe Atera, developer image
  1. Home
  2. Compare
  3. Petaling Jaya
  4. ARRA vs The Atera

ARRA vs The Atera

Two new launches in Petaling Jaya, side by side on the same facts.

ARRA from
RM 554,000
The Atera from
RM 580,000
ARRA to KJ26 Ara Damansara
9 min walk
The Atera to KJ21 Asia Jaya
5 min walk

The short answer.

ARRA and The Atera are both in Petaling Jaya. The main differences: ARRA starts about 4% lower and ARRA is freehold. Each point is set out below.

For the latest price list and available units, WhatsApp +60 10-827 8932.

Same facts, same order.

Developer list prices and figures from the project records. Walking times follow OpenStreetMap routes at 80 m a minute; other distances are straight-line.

ARRA and The Atera, side by side
FactARRAThe Atera
DeveloperPuncak DanaParamount Property
AddressAra Damansara, Petaling Jaya, MalaysiaPJ Seksyen 14, Petaling Jaya, Malaysia
TenureFreeholdLeasehold
Land titleCommercial under HDAResidential
Property typeCondominiumCondominium
Pricefrom RM 554,000 to RM 895,000from RM 580,000
Built-up721-1,285 sq ft775-1,400 sq ft
Asking psf (developer)RM 769RM 843
Bedrooms—2-4
Total units1275—
Maintenance feeRM0.33 psf (inclusive of sinking fund)—
CompletionUnder Construction TBCUnder Construction Q2 2028
Nearest station (walk)KJ26 Ara Damansara: 9 min walk (740 m on foot)KJ21 Asia Jaya: 0.34 km straight-line, about 5 min on foot (estimate)

Prices are developer list prices and change with each release. Station distances are straight-line unless a walking time is given.

Project data updated 2026-06-11Walking routes from OpenStreetMap

Where each one comes out ahead.

Worked out from the numbers above, one line per figure that differs. No figure is weighted; you decide which ones matter.

Where ARRA wins

  • Lower starting price: RM 554,000, RM 26,000 (about 4%) below RM 580,000.
  • Lower asking price per sq ft: from RM 769 against RM 843.
  • Smaller entry layout: from 721 sq ft against 775 sq ft.
  • Freehold title, against leasehold.

Where The Atera wins

  • Larger biggest layout: 1,400 sq ft against 1,285 sq ft.
  • Shorter walk to rail: 5 min to KJ21 Asia Jaya against 9 min to KJ26 Ara Damansara (walking routes or straight-line estimates).
  • Earlier expected completion: 2028 against 2030.

What actually differs

  • ARRA starts lower, at RM 554,000 against RM 580,000.
  • ARRA is freehold; The Atera is leasehold.
  • Land title differs: ARRA is commercial under HDA, The Atera is residential. Residential title is billed at domestic utility rates.
  • The Atera goes larger, up to 1,400 sq ft.
  • The Atera completes earlier, in 2028.

What finished homes in Ara Damansara sold for.

Both asking ranges on one scale with the median of recorded resale high-rise sales around them. A new launch and a completed resale home are different products.

ARRADeveloper asking price, new launch

RM 769

The AteraDeveloper asking price, new launch

RM 843

Completed schemes in Ara DamansaraResale median · 101 transactions in 10 schemes · Jan 2024 – May 2026

aboutRM 737

Resale figures are medians of recorded sales of completed high-rise homes; they are not valuations of either project. Medians only. The two projects sit in different resale localities; the first one on record is shown.

Resale = NAPIC open transaction data (Data Transaksi Terbuka): recorded transactions of completed homes, medians only. Asking = developer price lists on record.

Project data updated 2026-06-11Transactions checked 4 Oct 2026

Point by point.

The starting prices sit about 4% apart: RM 554,000 for ARRA versus RM 580,000 for The Atera, a difference of RM 26,000.

ARRA has the wider price spread, topping out at RM 895,000.

Built-up sizes run 721 to 1,285 sq ft at ARRA and 775 to 1,400 sq ft at The Atera.

On title, ARRA is freehold; The Atera is leasehold.

Handover status: ARRA under construction, with completion expected in 2030, The Atera under construction, with completion expected in 2028.

Only The Atera lists a bedroom count: 2 to 4 bedrooms.

Maintenance is listed at RM0.33 psf (inclusive of sinking fund) for ARRA and not stated for The Atera.

The nearest station is not measured for ARRA and Asia Jaya (about 0.34 km) for The Atera, measured in a straight line, so the walk is longer.

Which suits whom

  • Buyers who want the lower entry priceARRA
  • Buyers who only consider freeholdARRA

What to check before choosing

  • Construction progress: ARRA and The Atera are not yet completed, so check the latest stage of work against the expected date.
  • Lease term: The Atera is leasehold, so confirm how many years remain on the title.
  • Parking allocation can differ by unit type, so get the answer for your unit in writing rather than for the project as a whole.
  • Maintenance: multiply each rate by the size of the unit you are looking at, so you compare real monthly bills rather than rates.
  • The prices here are developer list prices; get the latest price list before you commit to a unit.
  • Foreign buyers: a purchase in KL needs consent from the land authority, so allow time for it in your plan.
Work out stamp duty and legal fees

Which one I would point you to.

ARRA has the lower entry price at RM 554,000, though the layout you end up choosing matters more than the headline figure. ARRA is freehold, so there is no lease to renew. Either way, ask for the current price list and walk both before you decide — I can arrange that.

Written by

Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd

Arrange both viewings on WhatsApp

Questions, answered from the record.

How far apart are the starting prices of ARRA and The Atera?

ARRA is listed from RM 554,000 and The Atera from RM 580,000, a difference of RM 26,000 or about 4%. Price lists change with each release.

Which one is closer to a train station?

ARRA: not measured. The Atera: Asia Jaya, about 0.34 km. Both are straight-line distances.

What are the tenure and completion of each?

ARRA: freehold, under construction, with completion expected in 2030. The Atera: leasehold, under construction, with completion expected in 2028.

What costs come on top of the price?

Stamp duty on the transfer, and if you take a loan, stamp duty on the loan agreement at 0.5% of your loan. Legal fees are separate. Foreign buyers in KL also need consent from the land authority.

Data last updated: 2026-06-11. Station distances are straight-line; prices are developer list prices and change with each release.

Both price lists, one viewing day.Ask on WhatsApp.

You get the current price list for each project, the latest offers and back-to-back viewings at both sales galleries. Enquiries and viewings: Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd.

  • Both price listsEvery layout in both projects
  • Floor plans2-4 bedrooms
  • Two viewings, one dayBoth are in Petaling Jaya