D'Evia, developer imageARRA, developer image
  1. Home
  2. Compare
  3. Petaling Jaya
  4. D'Evia vs ARRA

D'Evia vs ARRA

Two new launches in Petaling Jaya, side by side on the same facts.

D'Evia from
RM 498,100
ARRA from
RM 554,000
D'Evia to KG05 Kwasa Sentral
6 min walk
ARRA to KJ26 Ara Damansara
9 min walk

The short answer.

Both projects are in Petaling Jaya. What separates them most is that D'Evia starts about 10% lower and ARRA is freehold. The breakdown is below.

For the latest price list and available units, WhatsApp +60 10-827 8932.

Same facts, same order.

Developer list prices and figures from the project records. Walking times follow OpenStreetMap routes at 80 m a minute; other distances are straight-line.

D'Evia and ARRA, side by side
FactD'EviaARRA
DeveloperExsimPuncak Dana
AddressKwasa Damansara, Petaling Jaya, MalaysiaAra Damansara, Petaling Jaya, Malaysia
TenureLeaseholdFreehold
Land titleCommercial under HDACommercial under HDA
Property typeCondominiumCondominium
Pricefrom RM 498,100 to RM 799,400from RM 554,000 to RM 895,000
Built-up657-1,109 sq ft721-1,285 sq ft
Asking psf (developer)RM 689RM 769
Bedrooms2-3—
Total units4401275
Maintenance feeRM0.46psf (including sinking fund)RM0.33 psf (inclusive of sinking fund)
CompletionNew Launch Q4 2029Under Construction TBC
Nearest station (walk)KG05 Kwasa Sentral: 0.38 km straight-line, about 6 min on foot (estimate)KJ26 Ara Damansara: 9 min walk (740 m on foot)

Prices are developer list prices and change with each release. Station distances are straight-line unless a walking time is given.

Project data updated 2026-06-11Walking routes from OpenStreetMap

Where each one comes out ahead.

Worked out from the numbers above, one line per figure that differs. No figure is weighted; you decide which ones matter.

Where D'Evia wins

  • Lower starting price: RM 498,100, RM 55,900 (about 10%) below RM 554,000.
  • Lower asking price per sq ft: from RM 689 against RM 769.
  • Smaller entry layout: from 657 sq ft against 721 sq ft.
  • Fewer homes: 440 units against 1,275.
  • Shorter walk to rail: 6 min to KG05 Kwasa Sentral against 9 min to KJ26 Ara Damansara (walking routes or straight-line estimates).

Where ARRA wins

  • Larger biggest layout: 1,285 sq ft against 1,109 sq ft.
  • Lower listed maintenance rate: RM0.33 psf (inclusive of sinking fund), against RM0.46psf (including sinking fund). Check what each figure includes.
  • Freehold title, against leasehold.

What actually differs

  • D'Evia starts lower, at RM 498,100 against RM 554,000.
  • D'Evia is leasehold; ARRA is freehold.
  • ARRA has the lower monthly charge, at RM0.33 psf (inclusive of sinking fund).
  • ARRA goes larger, up to 1,285 sq ft.
  • D'Evia is the smaller community, at 440 units.

What finished homes in Ara Damansara sold for.

Both asking ranges on one scale with the median of recorded resale high-rise sales around them. A new launch and a completed resale home are different products.

D'EviaDeveloper asking price, new launch

RM 689

ARRADeveloper asking price, new launch

RM 769

Completed schemes in Ara DamansaraResale median · 101 transactions in 10 schemes · Jan 2024 – May 2026

aboutRM 737

Resale figures are medians of recorded sales of completed high-rise homes; they are not valuations of either project. Medians only. The two projects sit in different resale localities; the first one on record is shown.

Resale = NAPIC open transaction data (Data Transaksi Terbuka): recorded transactions of completed homes, medians only. Asking = developer price lists on record.

Project data updated 2026-06-11Transactions checked 4 Oct 2026

Point by point.

D'Evia opens RM 55,900 lower than ARRA, which is about 10% of the higher starting figure (RM 498,100 against RM 554,000).

ARRA has the wider price spread, topping out at RM 895,000.

Layouts at D'Evia span 657 to 1,109 sq ft; ARRA offers 721 to 1,285 sq ft.

D'Evia sits on leasehold land, ARRA on freehold land.

D'Evia is new launch, with completion expected in 2030; ARRA is under construction, with completion expected in 2030.

Only D'Evia lists a bedroom count: 2 to 3 bedrooms.

Unit count: 440 at D'Evia, 1,275 at ARRA.

Monthly charges: D'Evia RM0.46psf (including sinking fund); ARRA RM0.33 psf (inclusive of sinking fund).

Measured in a straight line, D'Evia is closest to Kwasa Sentral (about 0.35 km) and ARRA to not measured.

Which suits whom

  • Buyers who want the lower entry priceD'Evia
  • Families who need more floor areaARRA
  • Buyers who only consider freeholdARRA
  • Buyers who prefer fewer neighboursD'Evia
  • Buyers watching the monthly chargeARRA

What to check before choosing

  • Construction progress: D'Evia and ARRA are not yet completed, so check the latest stage of work against the expected date.
  • Lease term: D'Evia is leasehold, so confirm how many years remain on the title.
  • Parking allocation can differ by unit type, so get the answer for your unit in writing rather than for the project as a whole.
  • Maintenance: multiply each rate by the size of the unit you are looking at, so you compare real monthly bills rather than rates.
  • The prices here are developer list prices; get the latest price list before you commit to a unit.
  • Foreign buyers: a purchase in KL needs consent from the land authority, so allow time for it in your plan.
Work out stamp duty and legal fees

Which one I would point you to.

On holding cost, ARRA is the lighter one at RM0.33 psf (inclusive of sinking fund) against RM0.46psf (including sinking fund); on a 1,000 sq ft unit that difference runs to a few hundred ringgit a month, every month. D'Evia is the quieter building at 440 units against 1,275, which shows up in lift waits and how busy the facilities feel. D'Evia has the lower entry price at RM 498,100, though the layout you end up choosing matters more than the headline figure. ARRA is freehold, so there is no lease to renew. Either way, ask for the current price list and walk both before you decide — I can arrange that.

Written by

Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd

Arrange both viewings on WhatsApp

Questions, answered from the record.

How far apart are the starting prices of D'Evia and ARRA?

D'Evia is listed from RM 498,100 and ARRA from RM 554,000, a difference of RM 55,900 or about 10%. Price lists change with each release.

Which one is closer to a train station?

D'Evia: Kwasa Sentral, about 0.35 km. ARRA: not measured. Both are straight-line distances.

What are the tenure and completion of each?

D'Evia: leasehold, new launch, with completion expected in 2030. ARRA: freehold, under construction, with completion expected in 2030.

What costs come on top of the price?

Stamp duty on the transfer, and if you take a loan, stamp duty on the loan agreement at 0.5% of your loan. Legal fees are separate. Foreign buyers in KL also need consent from the land authority.

Data last updated: 2026-06-11. Station distances are straight-line; prices are developer list prices and change with each release.

Both price lists, one viewing day.Ask on WhatsApp.

You get the current price list for each project, the latest offers and back-to-back viewings at both sales galleries. Enquiries and viewings: Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd.

  • Both price listsEvery layout in both projects
  • Floor plans2-3 bedrooms
  • Two viewings, one dayBoth are in Petaling Jaya