Two new launches in KL City Centre, side by side on the same facts.
Orion Residence and Pavilion Square Office are both in KL City Centre. The main differences: Orion Residence starts about 26% lower, Orion Residence is freehold and Orion Residence is already completed. Each point is set out below.
For the latest price list and available units, WhatsApp +60 10-827 8932.
Developer list prices and figures from the project records. Walking times follow OpenStreetMap routes at 80 m a minute; other distances are straight-line.
| Fact | Orion Residence | Pavilion Square Office |
|---|---|---|
| Developer | Orion Tower Sdn Bhd | Pavilion Group |
| Address | Jalan Gading & Jalan Palmer, Bukit Bintang, Kuala Lumpur | Link to Pavilion Bukit Bintang, KL City Centre / Bukit Bintang |
| Tenure | Freehold | Leasehold |
| Land title | Commercial under HDA | Commercial |
| Property type | Serviced Apartment | Commercial Office |
| Price | from RM 1,450,000 to RM 4,000,000 | from RM 1,967,400 |
| Price psf | RM 2,707 – RM 3,750 | — |
| Asking psf (developer) | RM 2,707–3,750 | RM 1,800 |
| Built-up | 491-1,329 sq ft | 1,093-9,770 sq ft |
| Bedrooms | — | 1-5 |
| Total units | 298 | 106 |
| Blocks / floors | 1 / 46 | 26 |
| Car parks | 1-1 | — |
| Maintenance fee | RM 1.32 psf (RM 1.20 psf + 10% sinking fund) | RM 1.30/sf |
| Completion | Completed Est Q2 2025 | Under Construction 2027 |
| Nearest station (walk) | KG18A Bukit Bintang: 5 min walk (435 m on foot) | PY22 Conlay: 9 min walk (707 m on foot) |
Prices are developer list prices and change with each release. Station distances are straight-line unless a walking time is given.
Project data updated 2026-09-22Walking routes from OpenStreetMap
Worked out from the numbers above, one line per figure that differs. No figure is weighted; you decide which ones matter.
The starting prices sit about 26% apart: RM 1,450,000 for Orion Residence versus RM 1,967,400 for Pavilion Square Office, a difference of RM 517,400.
Pavilion Square Office goes larger, up to 9,770 sq ft, while Orion Residence covers 491 to 1,329 sq ft.
Only Orion Residence states a price per sq ft (RM 2,707 – RM 3,750); Pavilion Square Office does not, so no per-sq-ft comparison is made.
Tenure differs: Orion Residence is freehold and Pavilion Square Office is leasehold.
Handover status: Orion Residence completed (2026), Pavilion Square Office under construction, with completion expected in 2027.
Only Pavilion Square Office lists a bedroom count: 1 to 5 bedrooms.
Unit count: 298 at Orion Residence, 106 at Pavilion Square Office.
Maintenance is listed at RM 1.32 psf (RM 1.20 psf + 10% sinking fund) for Orion Residence and RM 1.30/sf for Pavilion Square Office.
Car parks: Orion Residence lists 1 per unit; Pavilion Square Office does not state a figure, so ask for the allocation of the exact unit.
For rail, Orion Residence has Bukit Bintang (about 0.33 km) and Pavilion Square Office has Raja Chulan (about 0.35 km); these are straight-line figures, not walking routes.
If you want to move in now, Orion Residence is the one to see: it is finished, so you can walk the actual unit rather than judge it from a plan. Pavilion Square Office is still under construction, completing 2027, which only suits you if the wait is not a problem. On holding cost, Pavilion Square Office is the lighter one at RM 1.30/sf against RM 1.32 psf (RM 1.20 psf + 10% sinking fund); on a 1,000 sq ft unit that difference runs to a few hundred ringgit a month, every month. Pavilion Square Office is the quieter building at 106 units against 298, which shows up in lift waits and how busy the facilities feel. Either way, ask for the current price list and walk both before you decide — I can arrange that.
Orion Residence is listed from RM 1,450,000 and Pavilion Square Office from RM 1,967,400, a difference of RM 517,400 or about 26%. Price lists change with each release.
Orion Residence: Bukit Bintang, about 0.33 km. Pavilion Square Office: Raja Chulan, about 0.35 km. Both are straight-line distances.
Orion Residence: freehold, completed (2026). Pavilion Square Office: leasehold, under construction, with completion expected in 2027.
Stamp duty on the transfer, and if you take a loan, stamp duty on the loan agreement at 0.5% of your loan. Legal fees are separate. Foreign buyers in KL also need consent from the land authority.
Data last updated: 2026-09-22. Station distances are straight-line; prices are developer list prices and change with each release.
You get the current price list for each project, the latest offers and back-to-back viewings at both sales galleries. Enquiries and viewings: Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd.
WhatsApp +60 10-827 8932