Livista, developer imageAmara, developer image
  1. Home
  2. Compare
  3. Petaling Jaya
  4. Livista vs Amara

Livista vs Amara

Two new launches in Petaling Jaya, side by side on the same facts.

Livista from
RM 515,000
Amara from
RM 574,200
Livista to PY06 Sri Damansara Barat
9 min walk
Amara to KJ26 Ara Damansara
12 min walk

The short answer.

Both projects are in Petaling Jaya. What separates them most is that Livista starts about 10% lower. The breakdown is below.

For the latest price list and available units, WhatsApp +60 10-827 8932.

Same facts, same order.

Developer list prices and figures from the project records. Walking times follow OpenStreetMap routes at 80 m a minute; other distances are straight-line.

Livista and Amara, side by side
FactLivistaAmara
DeveloperLand and GeneralPuncak Dana
AddressBandar Sri Damansara, Petaling Jaya, MalaysiaAra Damansara, Petaling Jaya, Malaysia
TenureFreeholdFreehold
Land titleCommercial under HDACommercial under HDA
Property typeCondominiumCondominium
Pricefrom RM 515,000 to RM 869,000from RM 574,200 to RM 1,073,500
Built-up690-1,035 sq ft655-1,272 sq ft
Asking psf (developer)RM 680–750RM 912
Bedrooms2-32-3
Total units700412
Maintenance feeRM 0.40 per sqft including sinking fundRM0.38 psf (RM0.35 psf + 10% sinking fund)
CompletionUnder Construction Q4 2026New Launch Q4 2028
Nearest station (walk)PY06 Sri Damansara Barat: 9 min walk (717 m on foot)KJ26 Ara Damansara: 12 min walk (920 m on foot)

Prices are developer list prices and change with each release. Station distances are straight-line unless a walking time is given.

Project data updated 2026-06-11Walking routes from OpenStreetMap

Where each one comes out ahead.

Worked out from the numbers above, one line per figure that differs. No figure is weighted; you decide which ones matter.

Where Livista wins

  • Lower starting price: RM 515,000, RM 59,200 (about 10%) below RM 574,200.
  • Lower asking price per sq ft: from RM 680 against RM 912.
  • Shorter walk to rail: 9 min to PY06 Sri Damansara Barat against 12 min to KJ26 Ara Damansara (OpenStreetMap walking routes).
  • Earlier expected completion: 2026 against 2028.

Where Amara wins

  • Smaller entry layout: from 655 sq ft against 690 sq ft.
  • Larger biggest layout: 1,272 sq ft against 1,035 sq ft.
  • Fewer homes: 412 units against 700.
  • Lower listed maintenance rate: RM0.38 psf (RM0.35 psf + 10% sinking fund), against RM 0.40 per sqft including sinking fund. Check what each figure includes.

What actually differs

  • Livista starts lower, at RM 515,000 against RM 574,200.
  • Amara has the lower monthly charge, at RM0.38 psf (RM0.35 psf + 10% sinking fund).
  • Amara goes larger, up to 1,272 sq ft.
  • Amara is the smaller community, at 412 units.
  • Livista completes earlier, in 2026.

What finished homes in Bandar Sri Damansara sold for.

Both asking ranges on one scale with the median of recorded resale high-rise sales around them. A new launch and a completed resale home are different products.

LivistaDeveloper asking price, new launch

RM 680–750

AmaraDeveloper asking price, new launch

RM 912

Completed schemes in Bandar Sri DamansaraResale median · 123 transactions in 8 schemes · Jan 2024 – May 2026

aboutRM 417

Resale figures are medians of recorded sales of completed high-rise homes; they are not valuations of either project. Medians only. The two projects sit in different resale localities; the first one on record is shown.

Resale = NAPIC open transaction data (Data Transaksi Terbuka): recorded transactions of completed homes, medians only. Asking = developer price lists on record.

Project data updated 2026-06-11Transactions checked 4 Oct 2026

Point by point.

On entry price, Livista starts at RM 515,000 and Amara at RM 574,200, a gap of RM 59,200 or about 10%.

Amara has the wider price spread, topping out at RM 1,073,500.

For space, compare 690 to 1,035 sq ft (Livista) with 655 to 1,272 sq ft (Amara); the smallest layout is not necessarily the cheapest unit.

There is no tenure difference here; each is freehold.

On timing, Livista is under construction, with completion expected in 2026 and Amara is new launch, with completion expected in 2028.

Livista offers 2 to 3 bedrooms; Amara offers 2 to 3.

In scale, Livista has 700 units and Amara has 412.

For running costs, Livista lists RM 0.40 per sqft including sinking fund while Amara lists RM0.38 psf (RM0.35 psf + 10% sinking fund).

The nearest station is Sri Damansara Barat (about 0.55 km) for Livista and not measured for Amara, measured in a straight line, so the walk is longer.

Which suits whom

  • Buyers who want the lower entry priceLivista
  • Families who need more floor areaAmara
  • Buyers who prefer fewer neighboursAmara
  • Buyers watching the monthly chargeAmara

What to check before choosing

  • Construction progress: Livista and Amara are not yet completed, so check the latest stage of work against the expected date.
  • Parking allocation can differ by unit type, so get the answer for your unit in writing rather than for the project as a whole.
  • Maintenance: multiply each rate by the size of the unit you are looking at, so you compare real monthly bills rather than rates.
  • The prices here are developer list prices; get the latest price list before you commit to a unit.
  • Foreign buyers: a purchase in KL needs consent from the land authority, so allow time for it in your plan.
Work out stamp duty and legal fees

Which one I would point you to.

On holding cost, Amara is the lighter one at RM0.38 psf (RM0.35 psf + 10% sinking fund) against RM 0.40 per sqft including sinking fund; on a 1,000 sq ft unit that difference runs to a few hundred ringgit a month, every month. Amara is the quieter building at 412 units against 700, which shows up in lift waits and how busy the facilities feel. Livista has the lower entry price at RM 515,000, though the layout you end up choosing matters more than the headline figure. Either way, ask for the current price list and walk both before you decide — I can arrange that.

Written by

Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd

Arrange both viewings on WhatsApp

Questions, answered from the record.

How far apart are the starting prices of Livista and Amara?

Livista is listed from RM 515,000 and Amara from RM 574,200, a difference of RM 59,200 or about 10%. Price lists change with each release.

Which one is closer to a train station?

Livista: Sri Damansara Barat, about 0.55 km. Amara: not measured. Both are straight-line distances.

What are the tenure and completion of each?

Livista: freehold, under construction, with completion expected in 2026. Amara: freehold, new launch, with completion expected in 2028.

What costs come on top of the price?

Stamp duty on the transfer, and if you take a loan, stamp duty on the loan agreement at 0.5% of your loan. Legal fees are separate. Foreign buyers in KL also need consent from the land authority.

Data last updated: 2026-06-11. Station distances are straight-line; prices are developer list prices and change with each release.

Both price lists, one viewing day.Ask on WhatsApp.

You get the current price list for each project, the latest offers and back-to-back viewings at both sales galleries. Enquiries and viewings: Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd.

  • Both price listsEvery layout in both projects
  • Floor plans2-3 and 2-3 bedrooms
  • Two viewings, one dayBoth are in Petaling Jaya