Amaya, developer imageAmara, developer image
  1. Home
  2. Compare
  3. Petaling Jaya
  4. Amaya vs Amara

Amaya vs Amara

Two new launches in Petaling Jaya, side by side on the same facts.

Amaya from
RM 561,000
Amara from
RM 574,200
Amaya to PY07 Sri Damansara Sentral
8 min walk
Amara to KJ26 Ara Damansara
12 min walk

The short answer.

Amaya and Amara are both in Petaling Jaya. The main differences: Amaya starts about 2% lower. Each point is set out below.

For the latest price list and available units, WhatsApp +60 10-827 8932.

Same facts, same order.

Developer list prices and figures from the project records. Walking times follow OpenStreetMap routes at 80 m a minute; other distances are straight-line.

Amaya and Amara, side by side
FactAmayaAmara
DeveloperTA GlobalPuncak Dana
AddressBandar Sri Damansara, Petaling Jaya, MalaysiaAra Damansara, Petaling Jaya, Malaysia
TenureFreeholdFreehold
Land titleCommercial under HDACommercial under HDA
Property typeCondominiumCondominium
Pricefrom RM 561,000 to RM 1,200,000from RM 574,200 to RM 1,073,500
Built-up539-1,230 sq ft655-1,272 sq ft
Asking psf (developer)RM 950RM 912
Bedrooms1-32-3
Total units1268412
Maintenance feeRM0.45 psf (including sinking fund)RM0.38 psf (RM0.35 psf + 10% sinking fund)
CompletionUnder Construction Q1 2028New Launch Q4 2028
Nearest station (walk)PY07 Sri Damansara Sentral: 0.52 km straight-line, about 8 min on foot (estimate)KJ26 Ara Damansara: 12 min walk (920 m on foot)

Prices are developer list prices and change with each release. Station distances are straight-line unless a walking time is given.

Project data updated 2026-06-11Walking routes from OpenStreetMap

Where each one comes out ahead.

Worked out from the numbers above, one line per figure that differs. No figure is weighted; you decide which ones matter.

Where Amaya wins

  • Lower starting price: RM 561,000, RM 13,200 (about 2%) below RM 574,200.
  • Smaller entry layout: from 539 sq ft against 655 sq ft.
  • Shorter walk to rail: 8 min to PY07 Sri Damansara Sentral against 12 min to KJ26 Ara Damansara (walking routes or straight-line estimates).

Where Amara wins

  • Lower asking price per sq ft: from RM 912 against RM 950.
  • Larger biggest layout: 1,272 sq ft against 1,230 sq ft.
  • Fewer homes: 412 units against 1,268.
  • Lower listed maintenance rate: RM0.38 psf (RM0.35 psf + 10% sinking fund), against RM0.45 psf (including sinking fund). Check what each figure includes.

What actually differs

  • Amaya starts lower, at RM 561,000 against RM 574,200.
  • Amara has the lower monthly charge, at RM0.38 psf (RM0.35 psf + 10% sinking fund).
  • Amara goes larger, up to 1,272 sq ft.
  • Amara is the smaller community, at 412 units.

What finished homes in Bandar Sri Damansara sold for.

Both asking ranges on one scale with the median of recorded resale high-rise sales around them. A new launch and a completed resale home are different products.

AmayaDeveloper asking price, new launch

RM 950

AmaraDeveloper asking price, new launch

RM 912

Completed schemes in Bandar Sri DamansaraResale median · 123 transactions in 8 schemes · Jan 2024 – May 2026

aboutRM 417

Resale figures are medians of recorded sales of completed high-rise homes; they are not valuations of either project. Medians only. The two projects sit in different resale localities; the first one on record is shown.

Resale = NAPIC open transaction data (Data Transaksi Terbuka): recorded transactions of completed homes, medians only. Asking = developer price lists on record.

Project data updated 2026-06-11Transactions checked 4 Oct 2026

Point by point.

If budget decides it, Amaya is the cheaper way in, listed from RM 561,000; Amara begins RM 13,200 higher, about 2% more.

At the top end, Amaya reaches higher, up to RM 1,200,000.

Amara goes larger, up to 1,272 sq ft, while Amaya covers 539 to 1,230 sq ft.

There is no tenure difference here; each is freehold.

As for when you get keys, Amaya is under construction, with completion expected in 2028, while Amara is new launch, with completion expected in 2028.

Bedrooms run 1 to 3 at Amaya and 2 to 3 at Amara.

Amara is the smaller community, with 412 units against 1,268.

Monthly charges: Amaya RM0.45 psf (including sinking fund); Amara RM0.38 psf (RM0.35 psf + 10% sinking fund).

Which suits whom

  • Buyers who want the lower entry priceAmaya
  • Singles or couples after a compact unitAmaya
  • Buyers who prefer fewer neighboursAmara
  • Buyers watching the monthly chargeAmara

What to check before choosing

  • Construction progress: Amaya and Amara are not yet completed, so check the latest stage of work against the expected date.
  • Parking allocation can differ by unit type, so get the answer for your unit in writing rather than for the project as a whole.
  • Maintenance: multiply each rate by the size of the unit you are looking at, so you compare real monthly bills rather than rates.
  • The prices here are developer list prices; get the latest price list before you commit to a unit.
  • Foreign buyers: a purchase in KL needs consent from the land authority, so allow time for it in your plan.
Work out stamp duty and legal fees

Which one I would point you to.

On holding cost, Amara is the lighter one at RM0.38 psf (RM0.35 psf + 10% sinking fund) against RM0.45 psf (including sinking fund); on a 1,000 sq ft unit that difference runs to a few hundred ringgit a month, every month. Amara is the quieter building at 412 units against 1,268, which shows up in lift waits and how busy the facilities feel. Amaya has the lower entry price at RM 561,000, though the layout you end up choosing matters more than the headline figure. Either way, ask for the current price list and walk both before you decide — I can arrange that.

Written by

Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd

Arrange both viewings on WhatsApp

Questions, answered from the record.

How far apart are the starting prices of Amaya and Amara?

Amaya is listed from RM 561,000 and Amara from RM 574,200, a difference of RM 13,200 or about 2%. Price lists change with each release.

Which one has the larger units?

Amaya: 539 to 1,230 sq ft. Amara: 655 to 1,272 sq ft.

What are the tenure and completion of each?

Amaya: freehold, under construction, with completion expected in 2028. Amara: freehold, new launch, with completion expected in 2028.

What costs come on top of the price?

Stamp duty on the transfer, and if you take a loan, stamp duty on the loan agreement at 0.5% of your loan. Legal fees are separate. Foreign buyers in KL also need consent from the land authority.

Data last updated: 2026-06-11. Station distances are straight-line; prices are developer list prices and change with each release.

Both price lists, one viewing day.Ask on WhatsApp.

You get the current price list for each project, the latest offers and back-to-back viewings at both sales galleries. Enquiries and viewings: Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd.

  • Both price listsEvery layout in both projects
  • Floor plans1-3 and 2-3 bedrooms
  • Two viewings, one dayBoth are in Petaling Jaya