Times Square 2, developer imageDIVINE KL City Centre, developer image
  1. Home
  2. Compare
  3. KL City Centre
  4. Times Square 2 vs DIVINE KL City Centre

Times Square 2 vs DIVINE KL City Centre

Two new launches in KL City Centre, side by side on the same facts.

Times Square 2 from
RM 688,000
DIVINE KL City Centre from
RM 997,000
Times Square 2 to MR5 Imbi
3 min walk
DIVINE KL City Centre to KJ10 KLCC
7 min walk

The short answer.

Short answer: Times Square 2 starts about 31% lower and Times Square 2 is freehold. Both sit in KL City Centre, and the details follow.

For the latest price list and available units, WhatsApp +60 10-827 8932.

Same facts, same order.

Developer list prices and figures from the project records. Walking times follow OpenStreetMap routes at 80 m a minute; other distances are straight-line.

Times Square 2 and DIVINE KL City Centre, side by side
FactTimes Square 2DIVINE KL City Centre
DeveloperBerjaya Times Square Sdn BhdChin Hin Group Property
AddressJalan Imbi, Imbi, 55100 Kuala LumpurOff Jalan Saloma, Kuala Lumpur
TenureFreeholdLeasehold
Land titleCommercial under HDACommercial under HDA
Property typeServiced ApartmentServiced Apartment
Pricefrom RM 688,000 to RM 2,565,000from RM 997,000 to RM 3,900,000
Price psfRM 1,409.86RM 1,600
Asking psf (developer)RM 1,410RM 1,600
Built-up488-1,356 sq ft502-1,319 sq ft
Total units629 (Residential) + 17 (Commercial incl. sky restaurant)1033
Blocks / floors—83
Maintenance feeRM0.66 psf + 10% sinking fundRM 0.68 psf
CompletionUnder Construction Launched May 2024, targeted completion Oct 2027New Launch Estimated completion Q3 2032
Nearest station (walk)MR5 Imbi: 3 min walk (201 m on foot)KJ10 KLCC: 7 min walk (593 m on foot)

Prices are developer list prices and change with each release. Station distances are straight-line unless a walking time is given.

Project data updated 2026-09-22Walking routes from OpenStreetMap

Where each one comes out ahead.

Worked out from the numbers above, one line per figure that differs. No figure is weighted; you decide which ones matter.

Where Times Square 2 wins

  • Lower starting price: RM 688,000, RM 309,000 (about 31%) below RM 997,000.
  • Lower asking price per sq ft: from RM 1,410 against RM 1,600.
  • Smaller entry layout: from 488 sq ft against 502 sq ft.
  • Larger biggest layout: 1,356 sq ft against 1,319 sq ft.
  • Fewer homes: 629 units against 1,033.
  • Shorter walk to rail: 3 min to MR5 Imbi against 7 min to KJ10 KLCC (OpenStreetMap walking routes).
  • Earlier expected completion: 2027 against 2032.
  • Lower listed maintenance rate: RM0.66 psf + 10% sinking fund, against RM 0.68 psf. Check what each figure includes.
  • Freehold title, against leasehold.

Where DIVINE KL City Centre wins

No figure above comes out ahead.

What actually differs

  • Times Square 2 starts lower, at RM 688,000 against RM 997,000.
  • Times Square 2 is freehold; DIVINE KL City Centre is leasehold.
  • Times Square 2 has the lower monthly charge, at RM0.66 psf + 10% sinking fund.
  • Times Square 2 goes larger, up to 1,356 sq ft.
  • Times Square 2 is the smaller community, at 629 units.
  • Times Square 2 completes earlier, in 2027.

Point by point.

The starting prices sit about 31% apart: RM 688,000 for Times Square 2 versus RM 997,000 for DIVINE KL City Centre, a difference of RM 309,000.

The upper end of the range belongs to DIVINE KL City Centre, at RM 3,900,000.

Built-up sizes run 488 to 1,356 sq ft at Times Square 2 and 502 to 1,319 sq ft at DIVINE KL City Centre.

The listed price per sq ft is RM 1,409.86 for Times Square 2 and RM 1,600 for DIVINE KL City Centre.

Tenure differs: Times Square 2 is freehold and DIVINE KL City Centre is leasehold.

Times Square 2 is under construction, with completion expected in 2027; DIVINE KL City Centre is new launch, with completion expected in 2032.

Unit count: 629 at Times Square 2, 1,033 at DIVINE KL City Centre.

Maintenance is listed at RM0.66 psf + 10% sinking fund for Times Square 2 and RM 0.68 psf for DIVINE KL City Centre.

Which suits whom

  • Buyers who want the lower entry priceTimes Square 2
  • Buyers who only consider freeholdTimes Square 2
  • Buyers who prefer fewer neighboursTimes Square 2
  • Buyers watching the monthly chargeTimes Square 2

What to check before choosing

  • Ask how far construction has gone at Times Square 2 and DIVINE KL City Centre, and how that compares with the expected completion.
  • Lease term: DIVINE KL City Centre is leasehold, so confirm how many years remain on the title.
  • Car parks: confirm the number and location of bays for the exact unit, in writing.
  • Work out the monthly maintenance for your actual unit size; a small gap per sq ft adds up on a larger layout.
  • Price list: list prices change with each release, so ask for the current list and the price of the specific unit.
  • Foreign buyers: a purchase in KL needs consent from the land authority, so allow time for it in your plan.
Work out stamp duty and legal fees

Which one I would point you to.

On holding cost, Times Square 2 is the lighter one at RM0.66 psf + 10% sinking fund against RM 0.68 psf; on a 1,000 sq ft unit that difference runs to a few hundred ringgit a month, every month. Times Square 2 is the quieter building at 629 units against 1,033, which shows up in lift waits and how busy the facilities feel. Times Square 2 has the lower entry price at RM 688,000, though the layout you end up choosing matters more than the headline figure. Times Square 2 is freehold, so there is no lease to renew. Either way, ask for the current price list and walk both before you decide — I can arrange that.

Written by

Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd

Arrange both viewings on WhatsApp

Questions, answered from the record.

How far apart are the starting prices of Times Square 2 and DIVINE KL City Centre?

Times Square 2 is listed from RM 688,000 and DIVINE KL City Centre from RM 997,000, a difference of RM 309,000 or about 31%. Price lists change with each release.

Which one has the larger units?

Times Square 2: 488 to 1,356 sq ft. DIVINE KL City Centre: 502 to 1,319 sq ft.

What are the tenure and completion of each?

Times Square 2: freehold, under construction, with completion expected in 2027. DIVINE KL City Centre: leasehold, new launch, with completion expected in 2032.

What costs come on top of the price?

Stamp duty on the transfer, and if you take a loan, stamp duty on the loan agreement at 0.5% of your loan. Legal fees are separate. Foreign buyers in KL also need consent from the land authority.

Data last updated: 2026-09-22. Station distances are straight-line; prices are developer list prices and change with each release.

Both price lists, one viewing day.Ask on WhatsApp.

You get the current price list for each project, the latest offers and back-to-back viewings at both sales galleries. Enquiries and viewings: Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd.

  • Both price listsEvery layout in both projects
  • Floor plans bedrooms
  • Two viewings, one dayBoth are in KL City Centre