1. Home
  2. Compare
  3. Johor Bahru
  4. Princess Cove RNF Phase 2 vs Princess Cove RNF Phase 3

Princess Cove RNF Phase 2 vs Princess Cove RNF Phase 3

Two new launches in Johor Bahru, side by side on the same facts.

Princess Cove RNF Phase 2 from
RM 690,000
Princess Cove RNF Phase 3 from
RM 720,000
Tenure
Freehold / Freehold
Completion
2023 / 2027

The short answer.

Princess Cove RNF Phase 2 and Princess Cove RNF Phase 3 are both in Johor Bahru. The main differences: Princess Cove RNF Phase 2 starts about 4% lower and Princess Cove RNF Phase 2 is already completed. Each point is set out below.

For the latest price list and available units, WhatsApp +60 10-827 8932.

Same facts, same order.

Developer list prices and figures from the project records. Walking times follow OpenStreetMap routes at 80 m a minute; other distances are straight-line.

Princess Cove RNF Phase 2 and Princess Cove RNF Phase 3, side by side
FactPrincess Cove RNF Phase 2Princess Cove RNF Phase 3
DeveloperR&F Development Sdn BhdR&F Development Sdn Bhd
AddressJalan Tanjung Puteri 1, R&F Tanjung Puteri, 80300 Johor Bahru, JohorJalan Tanjung Puteri 1, R&F Tanjung Puteri, 80300 Johor Bahru, Johor
TenureFreeholdFreehold
Land titleCommercial (Under HDA)Commercial (Under HDA)
Property typeServiced ApartmentServiced Apartment
Pricefrom RM 690,000 to RM 3,400,000from RM 720,000 to RM 3,100,000
Price psfRM 1,400 – RM 2,300RM 1,600
Asking psf (developer)RM 1,400–2,300RM 1,600
Built-up471-1,471 sq ft314-1,556 sq ft
Total units3,7244,385
Blocks / floors5056
Car parks1-11-1
Maintenance feeRM 0.42 psf (incl. sinking fund)RM 0.42 psf (incl. sinking fund)
CompletionReady To Move Completed 2023Under Construction 2027

Prices are developer list prices and change with each release. Station distances are straight-line unless a walking time is given.

Project data updated 2026-09-18Walking routes from OpenStreetMap

Where each one comes out ahead.

Worked out from the numbers above, one line per figure that differs. No figure is weighted; you decide which ones matter.

Where Princess Cove RNF Phase 2 wins

  • Lower starting price: RM 690,000, RM 30,000 (about 4%) below RM 720,000.
  • Lower asking price per sq ft: from RM 1,400 against RM 1,600.
  • Fewer homes: 3,724 units against 4,385.
  • Earlier expected completion: 2023 against 2027.

Where Princess Cove RNF Phase 3 wins

  • Smaller entry layout: from 314 sq ft against 471 sq ft.
  • Larger biggest layout: 1,556 sq ft against 1,471 sq ft.

What actually differs

  • Princess Cove RNF Phase 2 starts lower, at RM 690,000 against RM 720,000.
  • Princess Cove RNF Phase 3 goes larger, up to 1,556 sq ft.
  • Princess Cove RNF Phase 2 is the smaller community, at 3,724 units.
  • Princess Cove RNF Phase 2 completes earlier, in 2023.

Point by point.

If budget decides it, Princess Cove RNF Phase 2 is the cheaper way in, listed from RM 690,000; Princess Cove RNF Phase 3 begins RM 30,000 higher, about 4% more.

Princess Cove RNF Phase 2 has the wider price spread, topping out at RM 3,400,000.

Princess Cove RNF Phase 3 goes larger, up to 1,556 sq ft, while Princess Cove RNF Phase 2 covers 471 to 1,471 sq ft.

On a per-sq-ft basis the sheet shows RM 1,400 – RM 2,300 (Princess Cove RNF Phase 2) and RM 1,600 (Princess Cove RNF Phase 3).

Both projects are freehold.

Handover status: Princess Cove RNF Phase 2 completed (2023), Princess Cove RNF Phase 3 under construction, with completion expected in 2027.

In scale, Princess Cove RNF Phase 2 has 3,724 units and Princess Cove RNF Phase 3 has 4,385.

Maintenance is listed at RM 0.42 psf (incl. sinking fund) for Princess Cove RNF Phase 2 and RM 0.42 psf (incl. sinking fund) for Princess Cove RNF Phase 3.

Princess Cove RNF Phase 2 lists 1 car park(s) and Princess Cove RNF Phase 3 lists 1.

Which suits whom

  • Buyers who want the lower entry pricePrincess Cove RNF Phase 2
  • Buyers who want to move in soon and inspect a real unitPrincess Cove RNF Phase 2
  • Buyers who prefer fewer neighboursPrincess Cove RNF Phase 2

What to check before choosing

  • Ask how far construction has gone at Princess Cove RNF Phase 3, and how that compares with the expected completion.
  • Car parks: confirm the number and location of bays for the exact unit, in writing.
  • Work out the monthly maintenance for your actual unit size; a small gap per sq ft adds up on a larger layout.
  • Price list: list prices change with each release, so ask for the current list and the price of the specific unit.
  • Foreign buyers: a purchase in KL needs consent from the land authority, so allow time for it in your plan.
Work out stamp duty and legal fees

Which one I would point you to.

If you want to move in now, Princess Cove RNF Phase 2 is the one to see: it is finished, so you can walk the actual unit rather than judge it from a plan. Princess Cove RNF Phase 3 is still under construction, completing 2027, which only suits you if the wait is not a problem. Princess Cove RNF Phase 2 is the quieter building at 3,724 units against 4,385, which shows up in lift waits and how busy the facilities feel. Princess Cove RNF Phase 2 has the lower entry price at RM 690,000, though the layout you end up choosing matters more than the headline figure. Either way, ask for the current price list and walk both before you decide — I can arrange that.

Written by

Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd

Arrange both viewings on WhatsApp

Questions, answered from the record.

How far apart are the starting prices of Princess Cove RNF Phase 2 and Princess Cove RNF Phase 3?

Princess Cove RNF Phase 2 is listed from RM 690,000 and Princess Cove RNF Phase 3 from RM 720,000, a difference of RM 30,000 or about 4%. Price lists change with each release.

Which one has the larger units?

Princess Cove RNF Phase 2: 471 to 1,471 sq ft. Princess Cove RNF Phase 3: 314 to 1,556 sq ft.

What are the tenure and completion of each?

Princess Cove RNF Phase 2: freehold, completed (2023). Princess Cove RNF Phase 3: freehold, under construction, with completion expected in 2027.

What costs come on top of the price?

Stamp duty on the transfer, and if you take a loan, stamp duty on the loan agreement at 0.5% of your loan. Legal fees are separate. Foreign buyers in KL also need consent from the land authority.

Data last updated: 2026-09-18. Station distances are straight-line; prices are developer list prices and change with each release.

Both price lists, one viewing day.Ask on WhatsApp.

You get the current price list for each project, the latest offers and back-to-back viewings at both sales galleries. Enquiries and viewings: Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd.

  • Both price listsEvery layout in both projects
  • Floor plans bedrooms
  • Two viewings, one dayBoth are in Johor Bahru