Brixton, Causewayz Square, developer image
  1. Home
  2. Compare
  3. Johor Bahru
  4. Princess Cove RNF Phase 2 vs Brixton, Causewayz Square

Princess Cove RNF Phase 2 vs Brixton, Causewayz Square

Two new launches in Johor Bahru, side by side on the same facts.

Princess Cove RNF Phase 2 from
RM 690,000
Brixton, Causewayz Square from
RM 691,000
Tenure
Freehold / Freehold
Completion
2023 / 2030

The short answer.

Princess Cove RNF Phase 2 and Brixton, Causewayz Square are both in Johor Bahru. The main differences: Princess Cove RNF Phase 2 starts about 0% lower and Princess Cove RNF Phase 2 is already completed. Each point is set out below.

For the latest price list and available units, WhatsApp +60 10-827 8932.

Same facts, same order.

Developer list prices and figures from the project records. Walking times follow OpenStreetMap routes at 80 m a minute; other distances are straight-line.

Princess Cove RNF Phase 2 and Brixton, Causewayz Square, side by side
FactPrincess Cove RNF Phase 2Brixton, Causewayz Square
DeveloperR&F Development Sdn BhdExsim
AddressJalan Tanjung Puteri 1, R&F Tanjung Puteri, 80300 Johor Bahru, JohorCIQ, JB, Johor Bahru, Malaysia
TenureFreeholdFreehold
Land titleCommercial (Under HDA)Commercial under HDA
Property typeServiced ApartmentCondominium
Pricefrom RM 690,000 to RM 3,400,000from RM 691,000 to RM 1,237,000
Price psfRM 1,400 – RM 2,300—
Asking psf (developer)RM 1,400–2,300RM 1,376–1,515
Built-up471-1,471 sq ft474-850 sq ft
Bedrooms—1-3
Total units3,7241257
Blocks / floors50—
Car parks1-1—
Maintenance feeRM 0.42 psf (incl. sinking fund)RM0.36 psf (inclusive of sinking fund)
CompletionReady To Move Completed 2023New Launch TBC

Prices are developer list prices and change with each release. Station distances are straight-line unless a walking time is given.

Project data updated 2026-09-18Walking routes from OpenStreetMap

Where each one comes out ahead.

Worked out from the numbers above, one line per figure that differs. No figure is weighted; you decide which ones matter.

Where Princess Cove RNF Phase 2 wins

  • Lower starting price: RM 690,000, RM 1,000 (about 0%) below RM 691,000.
  • Smaller entry layout: from 471 sq ft against 474 sq ft.
  • Larger biggest layout: 1,471 sq ft against 850 sq ft.
  • Earlier expected completion: 2023 against 2030.

Where Brixton, Causewayz Square wins

  • Lower asking price per sq ft: from RM 1,376 against RM 1,400.
  • Fewer homes: 1,257 units against 3,724.
  • Lower listed maintenance rate: RM0.36 psf (inclusive of sinking fund), against RM 0.42 psf (incl. sinking fund). Check what each figure includes.

What actually differs

  • Princess Cove RNF Phase 2 starts lower, at RM 690,000 against RM 691,000.
  • Land title differs: Princess Cove RNF Phase 2 is commercial (under HDA), Brixton, Causewayz Square is commercial under HDA. Residential title is billed at domestic utility rates.
  • Brixton, Causewayz Square has the lower monthly charge, at RM0.36 psf (inclusive of sinking fund).
  • Princess Cove RNF Phase 2 goes larger, up to 1,471 sq ft.
  • Brixton, Causewayz Square is the smaller community, at 1,257 units.
  • Princess Cove RNF Phase 2 completes earlier, in 2023.

Point by point.

The starting prices sit about 0% apart: RM 690,000 for Princess Cove RNF Phase 2 versus RM 691,000 for Brixton, Causewayz Square, a difference of RM 1,000.

The upper end of the range belongs to Princess Cove RNF Phase 2, at RM 3,400,000.

Built-up sizes run 471 to 1,471 sq ft at Princess Cove RNF Phase 2 and 474 to 850 sq ft at Brixton, Causewayz Square.

A per-sq-ft figure is listed for Princess Cove RNF Phase 2 only, at RM 1,400 – RM 2,300.

Both projects are freehold.

Princess Cove RNF Phase 2 is completed (2023); Brixton, Causewayz Square is new launch, with completion expected in 2030.

Only Brixton, Causewayz Square lists a bedroom count: 1 to 3 bedrooms.

Unit count: 3,724 at Princess Cove RNF Phase 2, 1,257 at Brixton, Causewayz Square.

For running costs, Princess Cove RNF Phase 2 lists RM 0.42 psf (incl. sinking fund) while Brixton, Causewayz Square lists RM0.36 psf (inclusive of sinking fund).

Car parks: Princess Cove RNF Phase 2 lists 1 per unit; Brixton, Causewayz Square does not state a figure, so ask for the allocation of the exact unit.

Which suits whom

  • Buyers who want the lower entry pricePrincess Cove RNF Phase 2
  • Families who need more floor areaPrincess Cove RNF Phase 2
  • Buyers who want to move in soon and inspect a real unitPrincess Cove RNF Phase 2
  • Buyers who prefer fewer neighboursBrixton, Causewayz Square
  • Buyers watching the monthly chargeBrixton, Causewayz Square

What to check before choosing

  • Ask how far construction has gone at Brixton, Causewayz Square, and how that compares with the expected completion.
  • Car parks: confirm the number and location of bays for the exact unit, in writing.
  • Work out the monthly maintenance for your actual unit size; a small gap per sq ft adds up on a larger layout.
  • Price list: list prices change with each release, so ask for the current list and the price of the specific unit.
  • Foreign buyers: a purchase in KL needs consent from the land authority, so allow time for it in your plan.
Work out stamp duty and legal fees

Which one I would point you to.

If you want to move in now, Princess Cove RNF Phase 2 is the one to see: it is finished, so you can walk the actual unit rather than judge it from a plan. Brixton, Causewayz Square is still under construction, completing TBC, which only suits you if the wait is not a problem. On holding cost, Brixton, Causewayz Square is the lighter one at RM0.36 psf (inclusive of sinking fund) against RM 0.42 psf (incl. sinking fund); on a 1,000 sq ft unit that difference runs to a few hundred ringgit a month, every month. Brixton, Causewayz Square is the quieter building at 1,257 units against 3,724, which shows up in lift waits and how busy the facilities feel. Either way, ask for the current price list and walk both before you decide — I can arrange that.

Written by

Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd

Arrange both viewings on WhatsApp

Questions, answered from the record.

How far apart are the starting prices of Princess Cove RNF Phase 2 and Brixton, Causewayz Square?

Princess Cove RNF Phase 2 is listed from RM 690,000 and Brixton, Causewayz Square from RM 691,000, a difference of RM 1,000 or about 0%. Price lists change with each release.

Which one has the larger units?

Princess Cove RNF Phase 2: 471 to 1,471 sq ft. Brixton, Causewayz Square: 474 to 850 sq ft.

What are the tenure and completion of each?

Princess Cove RNF Phase 2: freehold, completed (2023). Brixton, Causewayz Square: freehold, new launch, with completion expected in 2030.

What costs come on top of the price?

Stamp duty on the transfer, and if you take a loan, stamp duty on the loan agreement at 0.5% of your loan. Legal fees are separate. Foreign buyers in KL also need consent from the land authority.

Data last updated: 2026-09-18. Station distances are straight-line; prices are developer list prices and change with each release.

Both price lists, one viewing day.Ask on WhatsApp.

You get the current price list for each project, the latest offers and back-to-back viewings at both sales galleries. Enquiries and viewings: Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd.

  • Both price listsEvery layout in both projects
  • Floor plans1-3 bedrooms
  • Two viewings, one dayBoth are in Johor Bahru