Princess Cove RNF Phase 3 Johor Bahru

Princess Cove RNF Phase 3 by R&F Development Sdn Bhd in Johor Bahru, Johor. From RM 720,000, Freehold Serviced Apartment with 314-1,556 sqft layouts. Floor plans, distance to the nearest stations and sales gallery appointments on propertyportal.my.

Princess Cove RNF Phase 3 project information

DeveloperR&F Development Sdn Bhd
LocationJalan Tanjung Puteri 1, R&F Tanjung Puteri, 80300 Johor Bahru, Johor
Property typeServiced Apartment
TenureFreehold
Land titleCommercial (Under HDA)
Starting priceRM 720,000
Price rangeRM 720,000 – RM 3,100,000
Price per sq ftRM 1,600
Built-up314-1,556 sqft
Total units4,385
Blocks / floors56 floors
Car park1 bay(s)
Maintenance feeRM 0.42 psf (incl. sinking fund)
CompletionUnder Construction, 2027

Last checked .

Studio to 5 bedrooms

Princess Cove RNF Phase 3 at a glance

  • From price: RM 720,000 to RM 3,100,000
  • Asking psf: RM 1,600 per sq ft
  • Tenure: Freehold
  • Completion: expected 2027
  • Units: 4,385, 56 floors
  • Density: about 78 homes a floor (4,385 units ÷ 56 floors)

Princess Cove RNF Phase 3 scorecard

Six sub-scores from 0 to 10, each with its formula and inputs. Data-based, not a recommendation; there is no overall total.

  • Price vs area: not scored — Not enough data on record. Formula: 5 − (gap % ÷ 5), kept within 0–10. Gap = this project's lowest asking psf against the median lowest asking psf of the other new launches in the same locality (needs 2 or more). Parity = 5; every 5% cheaper adds a point.
  • Rail access: not scored — Not scored for this area (rail data covers the Klang Valley only). Formula: 10 − (walk minutes − 5) ÷ 2, kept within 0–10. Five minutes or less = 10; 25 minutes or more = 0. Walk = measured OpenStreetMap route where one exists, otherwise straight-line × 1.3 at 80 m a minute.
  • Density: 0.3 / 10 — 4,385 units ÷ 56 floors = 78.3 a floor; 4 of 144 other projects pack more. Formula: 10 × share of the portal's projects that put more homes on each floor (units ÷ floors). Fewer homes per floor scores higher.
  • Supply pressure in area: 7.7 / 10 — 7,926 incoming + planned vs 67,912 standing in Johor Bahru district: 12%. Formula: 10 × (1 − pipeline ÷ 50%), kept within 0–10. Pipeline = condominium/apartment units under construction plus planned, as a share of the units already standing (NAPIC stock table). 0% = 10; 50% or more = 0.
  • Affordability vs district income: 4.5 / 10 — RM 720,000 ÷ (RM 8,977 × 12), Johor Bahru 2024: 6.7 years. Formula: 10 − 1.5 × (years − 3), kept within 0–10. Years = entry price ÷ (median monthly household income × 12) for the district (DOSM). Three years or less = 10.
  • Developer record: not scored — Not enough data on record. Formula: 10, minus 5 for each sick project, 10 for each abandoned project and 3 for each entry on the TEDUH offence list; minus 2 when TEDUH lists fewer than 2 projects (short record). Not scored until the developer is looked up on TEDUH.

Strengths

  • Incoming and planned condominium/apartment supply equals 12% of the 67,912 units standing in Johor Bahru district (NAPIC Residential Property Stock Table, Q2 2026)

Watch-outs

  • 13.8% of the 2,329 condominium/apartment units launched in Johor Bahru district from Q3 2025 to Q2 2026 were reported sold (NAPIC Table New Launches, Q2 2026)
  • Entry price is about 6.7 years of Johor Bahru's median household income (2024) (DOSM Household Income Survey via data.gov.my)
  • About 78 homes a floor (4,385 units over 56 floors)

Where the Princess Cove RNF Phase 3 asking price sits

Asking psf midpoint RM 1,600, above the Johor new-launch median of RM 1,360 (16 projects on this site with an asking psf).

ProjectLowest psfHighest psf
Gen SphereRM 1,250RM 1,392
Princess Cove RNF Phase 2RM 1,400RM 2,300
Princess Cove RNF Phase 3RM 1,600RM 1,600
GEN RISERM 1,108RM 1,346
Aethera ResidencesRM 1,533RM 1,533
Coronade TwinsRM 1,607RM 1,607

The market around Princess Cove RNF Phase 3

  • Supply pipeline: about 12% (1,519 building + 6,407 planned against 67,912 condominium and apartment units standing in Johor Bahru district, Q2 2026; NAPIC stock table)
  • Sales of new launches: 13.8% of 2,329 condominium and apartment units launched in Johor Bahru district from Q3 2025 to Q2 2026 were reported sold (NAPIC)
  • Price against incomes: the entry price of RM 720,000 is about 6.7 years of Johor Bahru's median household income (DOSM)

Who Princess Cove RNF Phase 3 suits

  • Transit commuter: Not scored for this area (rail data covers the Klang Valley only)
  • Own-stay family: Weak match (1 of 3 checks) — – No 3-bedroom layout on record; ✓ Largest layout 1,556 sq ft; – Nearby schools not on record. Rule: A 3-bedroom layout on record · largest home ≥ 1,000 sq ft · a school within a 10-minute walk
  • First-home buyer: Partial match (1 of 2 checks) — – Entry price is about 6.7 years of district median household income; ✓ Smallest layout 314 sq ft, from RM 720,000; Not scored for this area (rail checks cover the Klang Valley only). Rule: Entry price ≤ 5 years of district median income · smallest home ≤ 700 sq ft · walk to rail ≤ 10 min
  • Rental investor: Partial match (1 of 2 checks) — Not scored for this area (rail checks cover the Klang Valley only); – No 1-bedroom layout on record; ✓ Incoming + planned supply is 12% of standing stock in the area. Rule: Walk to rail ≤ 10 min · 1-bedroom layouts on record · incoming + planned supply < 20% of stock. Rental figures are not on record.

A match is a fit with the numbers, not advice to buy.

Princess Cove RNF Phase 3: checked facts

Analysis built 2026-10-30 from the figures on this page and public data: NAPIC, DOSM via data.gov.my, KPKT TEDUH, GTFS Static and Rapid Rail ridership via data.gov.my, OpenStreetMap and OSRM. Asking prices are not valuations.

Area and station guides

Can foreigners buy Princess Cove RNF Phase 3?

In Johor, a unit has to cost RM 1,000,000 or more before a foreign buyer can take it (plus a state consent fee of 3% of the price or RM30,000, whichever is higher, and an RM2,000 application fee per title). Princess Cove RNF Phase 3 is listed at RM 720,000 – RM 3,100,000, so by price only the units at RM 1,000,000 or more clear it. Because Princess Cove RNF Phase 3 is on commercial title, a unit below RM1,000,000 can still be sold to a foreign buyer when it is bought from the developer and the Johor State Authority approves that sale; the consent fee is then at least RM50,000. Resale units below RM1,000,000 do not have this route. Price is only the first test: every foreign purchase needs State Authority approval, Bumiputera-quota units are closed to foreign buyers, and foreign ownership in an apartment project is capped at 50% of its units.

Costs on top of the Princess Cove RNF Phase 3 price

ItemOn the RM 720,000 starting price
Transfer stamp duty, Malaysian buyerRM 15,600 (1% on the first RM100,000, 2% up to RM500,000, 3% up to RM1,000,000, 4% above).
Transfer stamp duty, foreign buyerRM 57,600 (only through the developer route with State Authority approval described above) (flat 8% on residential property from 1 January 2026, for non-citizens and foreign companies; permanent residents pay the Malaysian rate)
Loan agreement stamp duty0.5% of your loan
Legal feesBought from a licensed developer: 65% of the standard scale at this price (standard: 1.25% on the first RM500,000, 1% on the next RM7,000,000), a share fixed by Table B of the Solicitors' Remuneration Order 2023; plus 8% service tax

Princess Cove RNF Phase 3 monthly maintenance fee

The stated rate is RM 0.42 psf (incl. sinking fund). On the 314 sq ft unit that is about RM 132 a month, and about RM 654 on the 1,556 sq ft unit.

Princess Cove RNF Phase 3 compared with nearby projects

Among these 6 projects, Princess Cove RNF Phase 3 has the highest entry price per sq ft, at RM 2,293.

ProjectStarting priceEntry price per sq ftSizes (sq ft)Completion
Princess Cove RNF Phase 3RM 720,000RM 2,293314–1,5562027
Axis, Causewayz SquareRM 580,300RM 1,586366–592TBC
Brixton, Causewayz SquareRM 691,000RM 1,458474–850TBC
Dover, Causewayz SquareRM 727,500RM 1,535474–850TBC
The AsteriazRM 474,900RM 848560–915TBC
Gen SphereRM 609,000RM 1,327459–7552029

Entry price per sq ft = starting price ÷ built-up of the smallest layout; bigger layouts and higher floors give other figures.

Frequently asked questions about Princess Cove RNF Phase 3

What is the starting price of Princess Cove RNF Phase 3?

Developer list prices for Princess Cove RNF Phase 3 start from RM 720,000 and go up to RM 3,100,000 (about RM RM 1,600 per sq ft). Prices change with each release; ask for the current price list.

Is Princess Cove RNF Phase 3 freehold or leasehold?

Princess Cove RNF Phase 3 is Freehold under a commercial (under hda) title, developed by R&F Development Sdn Bhd.

What unit sizes and layouts are available at Princess Cove RNF Phase 3?

Built-up sizes range from 314 to 1,556 sq ft.

How many units and floors does Princess Cove RNF Phase 3 have?

4,385 units across 56 floors.

When will Princess Cove RNF Phase 3 be completed?

Under Construction; estimated completion 2027.

What is the maintenance fee at Princess Cove RNF Phase 3?

RM 0.42 psf (incl. sinking fund), as quoted by the developer.

How do I view Princess Cove RNF Phase 3 or get the floor plans?

WhatsApp Yee Woei Shyan (REN 46305, IQI Realty Sdn Bhd) at +60 10-827 8932, or use the enquiry form on this page for the price list, floor plans and a sales gallery appointment.

Princess Cove RNF Phase 3 on the agent's site

Princess Cove RNF Phase 3 on shyanyee.com — the agent's write-up of this project and how it compares with nearby launches.

Enquiries and sales gallery appointments: Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd. WhatsApp +60 10-827 8932.

Other projects in Johor Bahru

All new launches in Johor Bahru

All residences · Compare projects · Buying guide · Loan calculator