Gen Sphere Johor Bahru
Gen Sphere by Majestic Gen Sdn Bhd in Johor Bahru, Johor. From RM 609,000, Freehold Serviced Apartment with 459-755 sqft layouts. Floor plans, distance to the nearest stations and sales gallery appointments on propertyportal.my.
Gen Sphere project information
| Developer | Majestic Gen Sdn Bhd |
|---|---|
| Location | 23 & 25, Jalan Serampang, Taman Sri Tebrau, 80050 Johor Bahru, Johor |
| Property type | Serviced Apartment |
| Tenure | Freehold |
| Land title | Commercial under HDA |
| Starting price | RM 609,000 |
| Price range | RM 609,000 – RM 1,120,000 |
| Price per sq ft | RM 1,250 – RM 1,392 |
| Built-up | 459-755 sqft |
| Total units | 996 |
| Blocks / floors | 50 floors |
| Car park | 1 bay(s) |
| Maintenance fee | TBC |
| Completion | New Launch, 2029 |
Last checked .
Studio to 3 bedrooms
Gen Sphere at a glance
- From price: RM 609,000 to RM 1,120,000
- Asking psf: RM 1,250–1,392 per sq ft
- Tenure: Freehold
- Completion: expected 2029
- Units: 996, 50 floors, 1–3 bedrooms
- Density: about 20 homes a floor (996 units ÷ 50 floors)
- Against other new launches in Johor Bahru: -18% (median RM 1,533 psf of 3 projects)
Gen Sphere scorecard
Six sub-scores from 0 to 10, each with its formula and inputs. Data-based, not a recommendation; there is no overall total.
- Price vs area: 8.6 / 10 — Lowest asking RM 1,250 psf vs median RM 1,533 psf of 3 other new launches in Johor Bahru: -18%. Formula: 5 − (gap % ÷ 5), kept within 0–10. Gap = this project's lowest asking psf against the median lowest asking psf of the other new launches in the same locality (needs 2 or more). Parity = 5; every 5% cheaper adds a point.
- Rail access: not scored — Not scored for this area (rail data covers the Klang Valley only). Formula: 10 − (walk minutes − 5) ÷ 2, kept within 0–10. Five minutes or less = 10; 25 minutes or more = 0. Walk = measured OpenStreetMap route where one exists, otherwise straight-line × 1.3 at 80 m a minute.
- Density: 3.7 / 10 — 996 units ÷ 50 floors = 19.9 a floor; 53 of 144 other projects pack more. Formula: 10 × share of the portal's projects that put more homes on each floor (units ÷ floors). Fewer homes per floor scores higher.
- Supply pressure in area: 7.7 / 10 — 7,926 incoming + planned vs 67,912 standing in Johor Bahru district: 12%. Formula: 10 × (1 − pipeline ÷ 50%), kept within 0–10. Pipeline = condominium/apartment units under construction plus planned, as a share of the units already standing (NAPIC stock table). 0% = 10; 50% or more = 0.
- Affordability vs district income: 6.0 / 10 — RM 609,000 ÷ (RM 8,977 × 12), Johor Bahru 2024: 5.7 years. Formula: 10 − 1.5 × (years − 3), kept within 0–10. Years = entry price ÷ (median monthly household income × 12) for the district (DOSM). Three years or less = 10.
- Developer record: not scored — Not enough data on record. Formula: 10, minus 5 for each sick project, 10 for each abandoned project and 3 for each entry on the TEDUH offence list; minus 2 when TEDUH lists fewer than 2 projects (short record). Not scored until the developer is looked up on TEDUH.
Strengths
- Lowest asking psf about 18% below the median of 3 other new launches in Johor Bahru (RM 1,250 vs RM 1,533)
- Incoming and planned condominium/apartment supply equals 12% of the 67,912 units standing in Johor Bahru district (NAPIC Residential Property Stock Table, Q2 2026)
Watch-outs
- 13.8% of the 2,329 condominium/apartment units launched in Johor Bahru district from Q3 2025 to Q2 2026 were reported sold (NAPIC Table New Launches, Q2 2026)
- Entry price is about 5.7 years of Johor Bahru's median household income (2024) (DOSM Household Income Survey via data.gov.my)
- About 20 homes a floor (996 units over 50 floors)
Where the Gen Sphere asking price sits
Asking psf midpoint RM 1,321, below the Johor new-launch median of RM 1,360 (16 projects on this site with an asking psf).
| Project | Lowest psf | Highest psf |
|---|---|---|
| Gen Sphere | RM 1,250 | RM 1,392 |
| Princess Cove RNF Phase 2 | RM 1,400 | RM 2,300 |
| Princess Cove RNF Phase 3 | RM 1,600 | RM 1,600 |
| GEN RISE | RM 1,108 | RM 1,346 |
| Aethera Residences | RM 1,533 | RM 1,533 |
| Coronade Twins | RM 1,607 | RM 1,607 |
The market around Gen Sphere
- Supply pipeline: about 12% (1,519 building + 6,407 planned against 67,912 condominium and apartment units standing in Johor Bahru district, Q2 2026; NAPIC stock table)
- Sales of new launches: 13.8% of 2,329 condominium and apartment units launched in Johor Bahru district from Q3 2025 to Q2 2026 were reported sold (NAPIC)
- Price against incomes: the entry price of RM 609,000 is about 5.7 years of Johor Bahru's median household income (DOSM)
Gen Sphere against the nearest alternatives
The closest projects in the same area or within 15% of the entry price, on the same facts and the same scorecard.
| Fact | Gen Sphere | GEN RISE 0.2 km away, same area | Coronade Twins 0.8 km away, same area | Aethera Residences 1.2 km away, same area |
|---|---|---|---|---|
| From price | RM 609,000 | RM 563,000 | RM 450,000 | RM 996,200 |
| Asking psf | RM 1,250–1,392 | RM 1,108–1,346 | RM 1,607 | ≈ RM 1,533 |
| Built-up, sq ft | 459–755 | 497–1,930 | 280–1,230 | 650–2,547 |
| Tenure | Freehold | Freehold | Freehold | Freehold |
| Completion | New Launch 2029 | New Launch 2029 | Under Construction 2030 | Under Construction 2029 |
| Units · floors | 996 · 50 | 732 · 47+1 Basement | 539 · 41 | 786 · 52 |
| Homes per floor | about 19.9 | about 15.6 | about 13.1 | about 15.1 |
| Walk to rail | — | — | — | — |
| Price vs area /10 | 8.6 | 10.0 | 0.0 | 0.4 |
| Rail access /10 | — | — | — | — |
| Density /10 | 3.7 | 5.5 | 7.0 | 5.8 |
| Supply pressure in area /10 | 7.7 | 7.7 | 7.7 | 7.7 |
| Affordability vs district income /10 | 6.0 | 6.7 | 8.2 | 0.6 |
| Developer record /10 | — | — | — | — |
| Where it wins | earliest completion (2029) | lowest asking psf (from RM 1,108); earliest completion (2029) | lowest entry price (RM 450,000); fewest homes per floor (13.1) | largest layout (2,547 sq ft); earliest completion (2029) |
Who Gen Sphere suits
- Transit commuter: Not scored for this area (rail data covers the Klang Valley only)
- Own-stay family: Weak match (1 of 3 checks) — ✓ 3-bedroom layouts on the list (1–3); – Largest layout 755 sq ft; – 0 schools listed within a 10-minute walk. Rule: A 3-bedroom layout on record · largest home ≥ 1,000 sq ft · a school within a 10-minute walk
- First-home buyer: Partial match (1 of 2 checks) — – Entry price is about 5.7 years of district median household income; ✓ Smallest layout 459 sq ft, from RM 609,000; Not scored for this area (rail checks cover the Klang Valley only). Rule: Entry price ≤ 5 years of district median income · smallest home ≤ 700 sq ft · walk to rail ≤ 10 min
- Rental investor: Strong match (2 of 2 checks) — Not scored for this area (rail checks cover the Klang Valley only); ✓ 1-bedroom layouts on the list; ✓ Incoming + planned supply is 12% of standing stock in the area. Rule: Walk to rail ≤ 10 min · 1-bedroom layouts on record · incoming + planned supply < 20% of stock. Rental figures are not on record.
A match is a fit with the numbers, not advice to buy.
Who Gen Sphere may not suit
- Buyers who must move in before 2029 — Completion is expected in 2029, so a purchase signed now waits about 3 years for the keys.
Gen Sphere: checked facts
Analysis built 2026-10-30 from the figures on this page and public data: NAPIC, DOSM via data.gov.my, KPKT TEDUH, GTFS Static and Rapid Rail ridership via data.gov.my, OpenStreetMap and OSRM. Asking prices are not valuations.
Area and station guides
Can foreigners buy Gen Sphere?
In Johor, a unit has to cost RM 1,000,000 or more before a foreign buyer can take it (plus a state consent fee of 3% of the price or RM30,000, whichever is higher, and an RM2,000 application fee per title). Gen Sphere is listed at RM 609,000 – RM 1,120,000, so by price only the units at RM 1,000,000 or more clear it. Because Gen Sphere is on commercial title, a unit below RM1,000,000 can still be sold to a foreign buyer when it is bought from the developer and the Johor State Authority approves that sale; the consent fee is then at least RM50,000. Resale units below RM1,000,000 do not have this route. Price is only the first test: every foreign purchase needs State Authority approval, Bumiputera-quota units are closed to foreign buyers, and foreign ownership in an apartment project is capped at 50% of its units.
Costs on top of the Gen Sphere price
| Item | On the RM 609,000 starting price |
|---|---|
| Transfer stamp duty, Malaysian buyer | RM 12,270 (1% on the first RM100,000, 2% up to RM500,000, 3% up to RM1,000,000, 4% above). |
| Transfer stamp duty, foreign buyer | RM 48,720 (only through the developer route with State Authority approval described above) (flat 8% on residential property from 1 January 2026, for non-citizens and foreign companies; permanent residents pay the Malaysian rate) |
| Loan agreement stamp duty | 0.5% of your loan |
| Legal fees | Bought from a licensed developer: 65% of the standard scale at this price (standard: 1.25% on the first RM500,000, 1% on the next RM7,000,000), a share fixed by Table B of the Solicitors' Remuneration Order 2023; plus 8% service tax |
Gen Sphere compared with nearby projects
Among these 6 projects, Gen Sphere has the 3rd lowest entry price per sq ft, at RM 1,327.
| Project | Starting price | Entry price per sq ft | Sizes (sq ft) | Completion |
|---|---|---|---|---|
| Gen Sphere | RM 609,000 | RM 1,327 | 459–755 | 2029 |
| Axis, Causewayz Square | RM 580,300 | RM 1,586 | 366–592 | TBC |
| Brixton, Causewayz Square | RM 691,000 | RM 1,458 | 474–850 | TBC |
| Dover, Causewayz Square | RM 727,500 | RM 1,535 | 474–850 | TBC |
| The Asteriaz | RM 474,900 | RM 848 | 560–915 | TBC |
| M Grand Minori | RM 437,000 | RM 1,084 | 403–835 | 2030 |
Entry price per sq ft = starting price ÷ built-up of the smallest layout; bigger layouts and higher floors give other figures.
Frequently asked questions about Gen Sphere
What is the starting price of Gen Sphere?
Developer list prices for Gen Sphere start from RM 609,000 and go up to RM 1,120,000 (about RM RM 1,250 – RM 1,392 per sq ft). Prices change with each release; ask for the current price list.
Is Gen Sphere freehold or leasehold?
Gen Sphere is Freehold under a commercial under hda title, developed by Majestic Gen Sdn Bhd.
What unit sizes and layouts are available at Gen Sphere?
Built-up sizes range from 459 to 755 sq ft.
How many units and floors does Gen Sphere have?
996 units across 50 floors.
When will Gen Sphere be completed?
New Launch; estimated completion 2029.
What is the maintenance fee at Gen Sphere?
TBC per sq ft, as quoted by the developer.
How do I view Gen Sphere or get the floor plans?
WhatsApp Yee Woei Shyan (REN 46305, IQI Realty Sdn Bhd) at +60 10-827 8932, or use the enquiry form on this page for the price list, floor plans and a sales gallery appointment.
Gen Sphere on the agent's site
Gen Sphere on shyanyee.com — the agent's write-up of this project and how it compares with nearby launches.
Enquiries and sales gallery appointments: Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd. WhatsApp +60 10-827 8932.
Other projects in Johor Bahru
- Axis, Causewayz Square — Johor Bahru, Johor · Freehold · Condominium · from RM 580,300
- Brixton, Causewayz Square — Johor Bahru, Johor · Freehold · Condominium · from RM 691,000
- Dover, Causewayz Square — Johor Bahru, Johor · Freehold · Condominium · from RM 727,500
- The Asteriaz — Johor Bahru, Johor · Leasehold · Condominium · from RM 474,900
- M Grand Minori — Johor Bahru, Johor · Freehold · Serviced Apartment · from RM 437,000
- Princess Cove RNF Phase 2 — Johor Bahru, Johor · Freehold · Serviced Apartment · from RM 690,000
- Princess Cove RNF Phase 3 — Johor Bahru, Johor · Freehold · Serviced Apartment · from RM 720,000
Amberwood Resort Residences @ Johor Bahru — Larkin, Johor Bahru, Johor · Leasehold · High-Rise Residential · from RM 390,000
All new launches in Johor Bahru
All residences · Compare projects · Buying guide · Loan calculator