Myra Cove Cyberjaya

Myra Cove by Myra Land Sdn Bhd (1142636T) in Cyberjaya, Selangor. From RM 630,000, Freehold High-Rise Residential with 877-2,060 sqft layouts (2–4 bedrooms). Floor plans, distance to the nearest stations and sales gallery appointments on propertyportal.my.

Myra Cove — High-Rise Residential in Cyberjaya, Selangor by Myra Land Sdn Bhd (1142636T)
Myra Cove Cyberjaya

Myra Cove project information

DeveloperMyra Land Sdn Bhd (1142636T)
LocationPersiaran Multimedia, Cyber 7, 63000 Cyberjaya, Selangor
Property typeHigh-Rise Residential
TenureFreehold
Land titleResidential under HDA
Starting priceRM 630,000
Price rangeRM 630,000 – RM 1,005,000
Built-up877-2,060 sqft
Bedrooms2–4 bedrooms
Total units700 (Phase 1: 279 units, Phase 2: 421 units)
Blocks / floors25 floors
Maintenance feeRM0.25 psf + 10% sinking fund
CompletionUnder Construction, 2028

Myra Cove at a glance

  • From price: RM 630,000 to RM 1,005,000
  • Asking psf: RM 487 per sq ft
  • Tenure: Freehold
  • Completion: expected 2028
  • Units: 700, 25 floors, 2–4 bedrooms
  • Density: about 28 homes a floor (700 units ÷ 25 floors)
  • Walk to rail: 72 min to PY40 Cyberjaya City Centre (4.46 km straight-line, estimate)
  • Against completed resale homes in Cyberjaya: median about RM 467 psf (131 sales)

Myra Cove scorecard

Six sub-scores from 0 to 10, each with its formula and inputs. Data-based, not a recommendation; there is no overall total.

  • Price vs area: not scored — Not enough data on record. Formula: 5 − (gap % ÷ 5), kept within 0–10. Gap = this project's lowest asking psf against the median lowest asking psf of the other new launches in the same locality (needs 2 or more). Parity = 5; every 5% cheaper adds a point.
  • Rail access: 0.0 / 10 — 72 min to PY40 Cyberjaya City Centre, 4.46 km straight-line (estimate). Formula: 10 − (walk minutes − 5) ÷ 2, kept within 0–10. Five minutes or less = 10; 25 minutes or more = 0. Walk = measured OpenStreetMap route where one exists, otherwise straight-line × 1.3 at 80 m a minute.
  • Density: 1.9 / 10 — 700 units ÷ 25 floors = 28.0 a floor; 27 of 144 other projects pack more. Formula: 10 × share of the portal's projects that put more homes on each floor (units ÷ floors). Fewer homes per floor scores higher.
  • Supply pressure in area: not scored — Not enough data on record. Formula: 10 × (1 − pipeline ÷ 50%), kept within 0–10. Pipeline = condominium/apartment units under construction plus planned, as a share of the units already standing (NAPIC stock table). 0% = 10; 50% or more = 0.
  • Affordability vs district income: not scored — Not enough data on record. Formula: 10 − 1.5 × (years − 3), kept within 0–10. Years = entry price ÷ (median monthly household income × 12) for the district (DOSM). Three years or less = 10.
  • Developer record: not scored — Not enough data on record. Formula: 10, minus 5 for each sick project, 10 for each abandoned project and 3 for each entry on the TEDUH offence list; minus 2 when TEDUH lists fewer than 2 projects (short record). Not scored until the developer is looked up on TEDUH.

Strengths

  • Trains every 4 minutes at the weekday morning peak at Cyberjaya City Centre station (GTFS Static, Prasarana via data.gov.my)

Watch-outs

  • 72 min on foot to the nearest station, PY40 Cyberjaya City Centre (OpenStreetMap)
  • Asking range starts RM 20 psf (4%) above the median resale of completed homes in Cyberjaya (about RM 467 psf, 131 sales) (NAPIC open transaction data)
  • About 28 homes a floor (700 units over 25 floors)

Where the Myra Cove asking price sits

Asking psf midpoint RM 487, below the Selangor new-launch median of RM 697 (60 projects on this site with an asking psf).

ProjectLowest psfHighest psf
Sanderling 2 @ Lakefront ResidenceRM 518RM 518
Myra CoveRM 487RM 487

Completed homes resold in Cyberjaya: NAPIC median about RM 467 psf, 131 sales in 24 schemes, 2024-01 to 2026-06. A new launch and a completed resale home are different products.

Getting around from Myra Cove

ToRail, door to doorCar, no traffic
KL City Centre—37 min
TRX—39 min
Bangsar South—33 min
Mid Valley—33 min
Cyberjaya—5 min
Petaling Jaya SS2—34 min

Nearest station: PY40 Cyberjaya City Centre (Putrajaya Line); about 741 journeys start and 0 end there a day (30-day average); trains every 4 minutes at the weekday morning peak.

  • Schools: King Henry VIII College (0.43 km), Hall (0.74 km), SK Cyberjaya (0.75 km)
  • Shops: Village Grocer (0.66 km), Gem In Mall (0.88 km), 99 Speedmart (1.18 km), DPulze Shopping Centre (2.11 km), Shaftsbury Square Shop & Retail (3.28 km)
  • Health: Hospital Cyberjaya (0.72 km), Orion Clinic (0.8 km)
  • Parks: Taman Tasik Selangor Cyber Valley (0.91 km), Cyberjaya Mini Park (1.97 km)

Rail: GTFS Static and Rapid Rail ridership via data.gov.my, walk + half the peak wait + ride + 5 minutes a change. Car: OSRM on OpenStreetMap, no traffic. Places: OpenStreetMap, straight-line distance.

The market around Myra Cove

  • House price index (Selangor, high-rise): 213.0 in 2026 Q2 (preliminary), +0.9% on 2025 Q2 (NAPIC MHPI, 2010 = 100; covers the whole state)

Myra Cove against the nearest alternatives

The closest projects in the same area or within 15% of the entry price, on the same facts and the same scorecard.

FactMyra CoveSanderling 2 @ Lakefront Residence
2.1 km away, same area
Trinity Nordic Residences
13.1 km away, similar price
Alamanda Heights
14.9 km away, similar price
From priceRM 630,000RM 496,000RM 588,888RM 565,000
Asking psfRM 487RM 518RM 628RM 565–680
Built-up, sq ft877–2,060958–1,711937–2,014971–1,050
TenureFreeholdFreeholdFreeholdFreehold
CompletionUnder Construction 2028Under Construction 2028Under Construction 2029New Launch 2030
Units · floors700 · 25606 · 28714 · Tower A: 27-Storey, Tower B: 29-Storey, Tower C: 29-Storey440 · 36
Homes per floorabout 28about 21.6about 24.6about 12.2
Walk to rail72 min (estimate), PY40 Cyberjaya City Centre59 min (estimate), PY39 Cyberjaya Utara23 min, PY34 UPM26 min (estimate), PY31 Serdang Raya Utara
Price vs area /10————
Rail access /100.00.01.00.0
Density /101.93.02.47.2
Supply pressure in area /10——7.77.7
Affordability vs district income /10——7.67.9
Developer record /10————
Where it winslowest asking psf (from RM 487); largest layout (2,060 sq ft); earliest completion (2028)lowest entry price (RM 496,000); earliest completion (2028)shortest walk to rail (23 min)fewest homes per floor (12.2)

Who Myra Cove suits

  • Transit commuter: Weak match (1 of 3 checks) — – 72 min walk to PY40 Cyberjaya City Centre; ✓ Trains every 4 minutes at the morning peak; – No rail route to KL City Centre within the rules. Rule: Walk ≤ 10 min · peak train ≤ 5 min apart · rail to KL City Centre ≤ 35 min
  • Own-stay family: Partial match (2 of 3 checks) — ✓ 3-bedroom layouts on the list (2–4); ✓ Largest layout 2,060 sq ft; – 0 schools listed within a 10-minute walk. Rule: A 3-bedroom layout on record · largest home ≥ 1,000 sq ft · a school within a 10-minute walk
  • First-home buyer: Weak match (0 of 3 checks) — – District income not on record; – Smallest layout 877 sq ft, from RM 630,000; – Rail 72 min on foot. Rule: Entry price ≤ 5 years of district median income · smallest home ≤ 700 sq ft · walk to rail ≤ 10 min
  • Rental investor: Weak match (0 of 3 checks) — – 72 min walk to rail; – No 1-bedroom layout on record; – Area supply not on record. Rule: Walk to rail ≤ 10 min · 1-bedroom layouts on record · incoming + planned supply < 20% of stock. Rental figures are not on record.

A match is a fit with the numbers, not advice to buy.

Myra Cove: checked facts

Analysis built 2026-10-30 from the figures on this page and public data: NAPIC, DOSM via data.gov.my, KPKT TEDUH, GTFS Static and Rapid Rail ridership via data.gov.my, OpenStreetMap and OSRM. Asking prices are not valuations.

Can foreigners buy Myra Cove?

In Selangor, a unit has to cost RM 2,000,000 or more before a foreign buyer can take it (strata and landed strata homes only). Myra Cove is listed at RM 630,000 – RM 1,005,000, below that minimum on the prices on record. Price is only the first test: every foreign purchase needs State Authority approval.

Costs on top of the Myra Cove price

ItemOn the RM 630,000 starting price
Transfer stamp duty, Malaysian buyerRM 12,900 (1% on the first RM100,000, 2% up to RM500,000, 3% up to RM1,000,000, 4% above).
Transfer stamp duty, foreign buyer8% flat; no listed unit reaches the RM 2,000,000 foreign-buyer minimum (flat 8% on residential property from 1 January 2026, for non-citizens and foreign companies; permanent residents pay the Malaysian rate)
Loan agreement stamp duty0.5% of your loan
Legal feesBought from a licensed developer: 65% of the standard scale at this price (standard: 1.25% on the first RM500,000, 1% on the next RM7,000,000), a share fixed by Table B of the Solicitors' Remuneration Order 2023; plus 8% service tax

Myra Cove monthly maintenance fee

The stated rate is RM0.25 psf + 10% sinking fund. On the 877 sq ft unit that is about RM 219 a month, and about RM 515 on the 2,060 sq ft unit. The sinking fund is charged on top of that.

Myra Cove compared with other Selangor projects

This site has only 1 other priced project in the same area, so the table adds the Selangor projects on this site whose starting price is closest to Myra Cove's. Projects outside the area sit in different neighbourhoods, so location, access and surroundings will differ.

Among these 6 projects, Myra Cove has the 5th lowest entry price per sq ft, at RM 718.

ProjectStarting priceEntry price per sq ftSizes (sq ft)Completion
Myra CoveRM 630,000RM 718877–2,0602028
Sanderling 2 @ Lakefront ResidenceRM 496,000RM 518958–1,7112028
Dwi AuroraRM 631,000RM 701900–1,284Q2 2030
Daya ResidenceRM 631,800RM 667947–3,810TBC
The AldenzRM 622,200RM 803775–926Q2 2029
Forest HillRM 643,300RM 675953–1,527Q1 2027

Entry price per sq ft = starting price ÷ built-up of the smallest layout; bigger layouts and higher floors give other figures.

Frequently asked questions about Myra Cove

How much is Myra Cove?

List prices run RM 630,000–RM 1,005,000. A new release can carry different prices, so the latest price list is the one that counts.

What tenure and land title does Myra Cove have?

Freehold, Residential title, sold under the Housing Development Act. Developer: Myra Land Sdn Bhd (1142636T).

Which unit sizes does Myra Cove offer?

877–2,060 sq ft, 2–4 bedrooms.

How many homes are in Myra Cove?

700 units (Phase 1: 279 units, Phase 2: 421 units only) over 25 floors.

When is Myra Cove due for completion?

Completion is expected in 2028 (under construction).

What will maintenance cost at Myra Cove?

RM 0.25 a sq ft each month, with the sinking fund charged on top. For the smallest 877 sq ft unit that comes to about RM 219 a month.

How do I get the Myra Cove price list and floor plans?

Message Yee Woei Shyan (REN 46305, IQI Realty Sdn Bhd) on WhatsApp at +60 10-827 8932; the current price list, floor plans and a sales gallery slot are sent there.

Enquiries and sales gallery appointments: Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd. WhatsApp +60 10-827 8932.

Other projects in Cyberjaya

All new launches in Cyberjaya

All residences · Compare projects · Buying guide · Loan calculator