Est8 @ Seputeh
Est8 @ Seputeh by Titian Sama Sdn. Bhd. (Subsidiary of Eupe Corporation Berhad) in Seputeh, Kuala Lumpur. From RM 529,000, Leasehold High-Rise Residential with 543-1,947 sqft layouts (1–4 bedrooms). Floor plans, distance to the nearest stations and sales gallery appointments on propertyportal.my.
Est8 @ Seputeh project information
| Developer | Titian Sama Sdn. Bhd. (Subsidiary of Eupe Corporation Berhad) |
|---|---|
| Location | Jalan Syed Putra, Seputeh, 58000 Kuala Lumpur |
| Property type | High-Rise Residential |
| Tenure | Leasehold |
| Land title | Commercial under HDA |
| Starting price | RM 529,000 |
| Price range | RM 529,000 – RM 1,946,400 |
| Price per sq ft | 822 |
| Built-up | 543-1,947 sqft |
| Bedrooms | 1–4 bedrooms |
| Total units | 821 |
| Blocks / floors | Block A: 42 Floors, Block B: 41 Floors, Block C: 2 Floors floors |
| Maintenance fee | RM 0.44 psf (Including sinking fund) |
| Completion | Completed, 2026 |
Est8 @ Seputeh at a glance
- From price: RM 529,000 to RM 1,946,400
- Asking psf: RM 822 per sq ft
- Tenure: Leasehold
- Completion: completed 2026
- Units: 821, 42 floors, 1–4 bedrooms
- Density: about 20 homes a floor (821 units ÷ 42 floors)
- Walk to rail: 14 min to KJ17 Abdullah Hukum (0.89 km straight-line, estimate)
- Against other new launches in Seputeh: -4% (median RM 860 psf of 3 projects)
Est8 @ Seputeh scorecard
Six sub-scores from 0 to 10, each with its formula and inputs. Data-based, not a recommendation; there is no overall total.
- Price vs area: 5.8 / 10 — Lowest asking RM 822 psf vs median RM 860 psf of 3 other new launches in Seputeh: -4%. Formula: 5 − (gap % ÷ 5), kept within 0–10. Gap = this project's lowest asking psf against the median lowest asking psf of the other new launches in the same locality (needs 2 or more). Parity = 5; every 5% cheaper adds a point.
- Rail access: 5.5 / 10 — 14 min to KJ17 Abdullah Hukum, 0.89 km straight-line (estimate). Formula: 10 − (walk minutes − 5) ÷ 2, kept within 0–10. Five minutes or less = 10; 25 minutes or more = 0. Walk = measured OpenStreetMap route where one exists, otherwise straight-line × 1.3 at 80 m a minute.
- Density: 3.9 / 10 — 821 units ÷ 42 floors = 19.5 a floor; 56 of 144 other projects pack more. Formula: 10 × share of the portal's projects that put more homes on each floor (units ÷ floors). Fewer homes per floor scores higher.
- Supply pressure in area: 3.7 / 10 — 19,282 incoming + planned vs 60,757 standing in Mukim Kuala Lumpur: 32%. Formula: 10 × (1 − pipeline ÷ 50%), kept within 0–10. Pipeline = condominium/apartment units under construction plus planned, as a share of the units already standing (NAPIC stock table). 0% = 10; 50% or more = 0.
- Affordability vs district income: 8.0 / 10 — RM 529,000 ÷ (RM 10,234 × 12), W.P. Kuala Lumpur 2022: 4.3 years. Formula: 10 − 1.5 × (years − 3), kept within 0–10. Years = entry price ÷ (median monthly household income × 12) for the district (DOSM). Three years or less = 10.
- Developer record: not scored — Not enough data on record. Formula: 10, minus 5 for each sick project, 10 for each abandoned project and 3 for each entry on the TEDUH offence list; minus 2 when TEDUH lists fewer than 2 projects (short record). Not scored until the developer is looked up on TEDUH.
Strengths
- Trains every 4 minutes at the weekday morning peak at Abdullah Hukum station (GTFS Static, Prasarana via data.gov.my)
- Lowest asking psf about 4% below the median of 3 other new launches in Seputeh (RM 822 vs RM 860)
- 62.3% of the 1,095 condominium/apartment units launched in Mukim Kuala Lumpur from Q3 2025 to Q2 2026 were reported sold (NAPIC Table New Launches, Q2 2026)
- Entry price is about 4.3 years of W.P. Kuala Lumpur's median household income (2022) (DOSM Household Income Survey via data.gov.my)
Watch-outs
- Incoming and planned condominium/apartment supply equals 32% of the 60,757 units standing in Mukim Kuala Lumpur (NAPIC Residential Property Stock Table, Q2 2026)
- About 20 homes a floor (821 units over 42 floors)
Where the Est8 @ Seputeh asking price sits
Asking psf midpoint RM 822, below the Kuala Lumpur new-launch median of RM 978 (68 projects on this site with an asking psf).
| Project | Lowest psf | Highest psf |
|---|---|---|
| One Seputeh | RM 1,100 | RM 1,100 |
| Tria Seputeh | RM 820 | RM 820 |
| Lunar Seputeh | RM 860 | RM 900 |
| Est8 @ Seputeh | RM 822 | RM 822 |
Getting around from Est8 @ Seputeh
| To | Rail, door to door | Car, no traffic |
|---|---|---|
| KL City Centre | 39 min: walk 14, wait 2, train 19, walk 4; Abdullah Hukum to KLCC | 14 min |
| TRX | 42 min: walk 14, wait 2, train 18, 1 change, walk 3; Abdullah Hukum to Tun Razak Exchange | 15 min |
| Bangsar South | 24 min: walk 14, wait 2, train 2, walk 6; Abdullah Hukum to Kerinchi | 11 min |
| Mid Valley | 6 min on foot (0.39 km) | 9 min |
| Cyberjaya | — | 31 min |
| Petaling Jaya SS2 | 50 min: walk 14, wait 2, train 13, walk 21; Abdullah Hukum to Taman Paramount | 16 min |
Nearest station: KJ17 Abdullah Hukum (Kelana Jaya Line); about 13,495 journeys start and 13,935 end there a day (30-day average); trains every 4 minutes at the weekday morning peak.
- Transit: KB02 Seputeh (0.26 km), KB01 Mid Valley (0.36 km), KD02 Angkasapuri (0.83 km)
- Schools: Sekolah Kebangsaan Bangsar (1.11 km), Campus Rangers International School (1.14 km), Sekolah Antarabangsa Vikas (1.22 km)
- Shops: Bilabila Mart (0.26 km), AEON (0.38 km), Mid Valley Megamall (0.39 km), The Gardens Mall (0.57 km), KL Eco City Mall (0.78 km)
- Health: Poliklinik & Surgeri Seputeh (0.29 km), Belle Sense Clinic (0.5 km)
- Parks: Jalan Desa Bakti Public Playground (1.36 km), The Central Park (1.45 km)
Rail: GTFS Static and Rapid Rail ridership via data.gov.my, walk + half the peak wait + ride + 5 minutes a change. Car: OSRM on OpenStreetMap, no traffic. Places: OpenStreetMap, straight-line distance.
The market around Est8 @ Seputeh
- Supply pipeline: about 32% (10,792 building + 8,490 planned against 60,757 condominium and apartment units standing in Mukim Kuala Lumpur, Q2 2026; NAPIC stock table)
- Sales of new launches: 62.3% of 1,095 condominium and apartment units launched in Mukim Kuala Lumpur from Q3 2025 to Q2 2026 were reported sold (NAPIC)
- House price index (Kuala Lumpur, high-rise): 229.8 in 2026 Q2 (preliminary), +1.5% on 2025 Q2 (NAPIC MHPI, 2010 = 100; covers all of Kuala Lumpur)
- Price against incomes: the entry price of RM 529,000 is about 4.3 years of W.P. Kuala Lumpur's median household income (DOSM)
Est8 @ Seputeh against the nearest alternatives
The closest projects in the same area or within 15% of the entry price, on the same facts and the same scorecard.
| Fact | Est8 @ Seputeh | Lunar Seputeh 0.8 km away, same area | Tria Seputeh 0.9 km away, same area | River Park 0.8 km away, similar price |
|---|---|---|---|---|
| From price | RM 529,000 | RM 607,800 | RM 736,800 | RM 604,000 |
| Asking psf | RM 822 | RM 860–900 | RM 820 | RM 799 |
| Built-up, sq ft | 543–1,947 | 683–1,646 | 764–4,575 | 812–1,180 |
| Tenure | Leasehold | Leasehold | Leasehold | Leasehold |
| Completion | Completed 2026 | New Launch 2030 | Completed 2023 | Under Construction 2026 |
| Units · floors | 821 · Block A: 42 Floors, Block B: 41 Floors, Block C: 2 Floors | 483 · 50 | 734 · Pelto: 38 storeys, Ebon: 33 storeys, Cavi: 33 storeys, Riverfront Villas: 7 storeys | 1,332 · Tower A: 46-storey, Tower B: 47-storey, Tower C: 46-storey |
| Homes per floor | about 19.5 | about 9.7 | about 19.3 | about 28.3 |
| Walk to rail | 14 min (estimate), KJ17 Abdullah Hukum | 19 min (estimate), KJ17 Abdullah Hukum | 20 min (estimate), KJ18 Kerinchi | 15 min (estimate), KJ18 Kerinchi |
| Price vs area /10 | 5.8 | 4.0 | 6.0 | 7.6 |
| Rail access /10 | 5.5 | 3.0 | 2.5 | 5.0 |
| Density /10 | 3.9 | 8.2 | 4.1 | 1.8 |
| Supply pressure in area /10 | 3.7 | 3.7 | 3.7 | 3.7 |
| Affordability vs district income /10 | 8.0 | 7.1 | 5.5 | 7.1 |
| Developer record /10 | — | — | — | — |
| Where it wins | lowest entry price (RM 529,000); shortest walk to rail (14 min) | fewest homes per floor (9.7) | largest layout (4,575 sq ft); earliest completion (2023) | lowest asking psf (from RM 799) |
Who Est8 @ Seputeh suits
- Transit commuter: Weak match (1 of 3 checks) — – 14 min walk to KJ17 Abdullah Hukum; ✓ Trains every 4 minutes at the morning peak; – 39 min door to door to KL City Centre by rail. Rule: Walk ≤ 10 min · peak train ≤ 5 min apart · rail to KL City Centre ≤ 35 min
- Own-stay family: Partial match (2 of 3 checks) — ✓ 3-bedroom layouts on the list (1–4); ✓ Largest layout 1,947 sq ft; – 0 schools listed within a 10-minute walk. Rule: A 3-bedroom layout on record · largest home ≥ 1,000 sq ft · a school within a 10-minute walk
- First-home buyer: Partial match (2 of 3 checks) — ✓ Entry price is about 4.3 years of district median household income; ✓ Smallest layout 543 sq ft, from RM 529,000; – Rail 14 min on foot. Rule: Entry price ≤ 5 years of district median income · smallest home ≤ 700 sq ft · walk to rail ≤ 10 min
- Rental investor: Weak match (1 of 3 checks) — – 14 min walk to rail; ✓ 1-bedroom layouts on the list; – Incoming + planned supply is 32% of standing stock in the area. Rule: Walk to rail ≤ 10 min · 1-bedroom layouts on record · incoming + planned supply < 20% of stock. Rental figures are not on record.
A match is a fit with the numbers, not advice to buy.
Est8 @ Seputeh: checked facts
Analysis built 2026-10-30 from the figures on this page and public data: NAPIC, DOSM via data.gov.my, KPKT TEDUH, GTFS Static and Rapid Rail ridership via data.gov.my, OpenStreetMap and OSRM. Asking prices are not valuations.
Area and station guides
- New launches in Seputeh
- New launches near Seputeh station — 260 m (straight line)
- New launches near Mid Valley station — 360 m (straight line)
- New launches near Angkasapuri station — 830 m (straight line)
- New launches near Abdullah Hukum station — 880 m (straight line)
- New launches near Kerinchi station — 1.31 km (straight line)
- New launches near Bangsar station — 1.31 km (straight line)
Can foreigners buy Est8 @ Seputeh?
In Kuala Lumpur, a unit has to cost RM 1,000,000 or more before a foreign buyer can take it. Est8 @ Seputeh is listed at RM 529,000 – RM 1,946,400, so by price only the units at RM 1,000,000 or more clear it. Price is only the first test: every foreign purchase needs consent from the land authority.
Costs on top of the Est8 @ Seputeh price
| Item | On the RM 529,000 starting price |
|---|---|
| Transfer stamp duty, Malaysian buyer | RM 9,870 (1% on the first RM100,000, 2% up to RM500,000, 3% up to RM1,000,000, 4% above). |
| Transfer stamp duty, foreign buyer | RM 80,000 on a RM 1,000,000 unit, the lowest price a foreign buyer can take here (flat 8% on residential property from 1 January 2026, for non-citizens and foreign companies; permanent residents pay the Malaysian rate) |
| Loan agreement stamp duty | 0.5% of your loan |
| Legal fees | Bought from a licensed developer: 65% of the standard scale at this price (standard: 1.25% on the first RM500,000, 1% on the next RM7,000,000), a share fixed by Table B of the Solicitors' Remuneration Order 2023; plus 8% service tax |
Est8 @ Seputeh monthly maintenance fee
The stated rate is RM 0.44 psf (Including sinking fund). On the 543 sq ft unit that is about RM 239 a month, and about RM 857 on the 1,947 sq ft unit.
Est8 @ Seputeh compared with nearby projects
Among these 3 projects, Est8 @ Seputeh has the highest entry price per sq ft, at RM 974.
| Project | Starting price | Entry price per sq ft | Sizes (sq ft) | Completion |
|---|---|---|---|---|
| Est8 @ Seputeh | RM 529,000 | RM 974 | 543–1,947 | 2026 |
| Tria Seputeh | RM 736,800 | RM 964 | 764–4,575 | Q2 2023 |
| Lunar Seputeh | RM 607,800 | RM 890 | 683–1,646 | 2030 |
Entry price per sq ft = starting price ÷ built-up of the smallest layout; bigger layouts and higher floors give other figures.
Frequently asked questions about Est8 @ Seputeh
How much is Est8 @ Seputeh?
List prices run RM 529,000–RM 1,946,400, roughly RM 822 per sq ft. A new release can carry different prices, so the latest price list is the one that counts.
What tenure and land title does Est8 @ Seputeh have?
Leasehold, Commercial title, sold under the Housing Development Act. Developer: Titian Sama Sdn. Bhd. (Subsidiary of Eupe Corporation Berhad).
Which unit sizes does Est8 @ Seputeh offer?
543–1,947 sq ft, 1–4 bedrooms.
How many homes are in Est8 @ Seputeh?
821 units.
When is Est8 @ Seputeh due for completion?
It was completed in 2026.
What will maintenance cost at Est8 @ Seputeh?
RM 0.44 a sq ft each month, sinking fund included. For the smallest 543 sq ft unit that comes to about RM 239 a month.
How do I get the Est8 @ Seputeh price list and floor plans?
Message Yee Woei Shyan (REN 46305, IQI Realty Sdn Bhd) on WhatsApp at +60 10-827 8932; the current price list, floor plans and a sales gallery slot are sent there.
Enquiries and sales gallery appointments: Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd. WhatsApp +60 10-827 8932.
Other projects in Seputeh
- One Seputeh — Seputeh / Old Klang Road, Kuala Lumpur · Freehold · Serviced Apartment
Tria Seputeh — Seputeh / Old Klang Road, Kuala Lumpur · Leasehold · Condominium · from RM 736,800
Lunar Seputeh — Seputeh, Old Klang Road, Kuala Lumpur · Leasehold · High-Rise Residential · from RM 607,800
All residences · Compare projects · Buying guide · Loan calculator