EkoTitiwangsa Setapak
EkoTitiwangsa by Ekovest Berhad (Ekovest Land Sdn Bhd) in Setapak, Kuala Lumpur. From RM 434,700, Freehold Commercial with 690-1,120 sqft layouts (1+1–3 bedrooms). Floor plans, distance to the nearest stations and sales gallery appointments on propertyportal.my.
EkoTitiwangsa project information
| Developer | Ekovest Berhad (Ekovest Land Sdn Bhd) |
|---|---|
| Location | Jalan Pahang, Setapak, 53000 Kuala Lumpur |
| Property type | Commercial |
| Tenure | Freehold |
| Land title | Commercial under HDA (Block B & C serviced apartments); Block A office suites: Commercial |
| Starting price | RM 434,700 |
| Price range | RM 434,700 – RM 739,600 |
| Built-up | 690-1,120 sqft |
| Bedrooms | 1+1–3 bedrooms |
| Total units | 615 |
| Blocks / floors | 46 floors |
| Maintenance fee | Office: RM 0.25 PSF; Service Apartment: RM 0.30 PSF |
| Completion | Under Construction, 2028 |
EkoTitiwangsa at a glance
- From price: RM 434,700 to RM 739,600
- Asking psf: RM 630 per sq ft
- Tenure: Freehold
- Completion: expected 2028
- Units: 615, 46 floors, 1+1–3 bedrooms
- Density: about 13 homes a floor (615 units ÷ 46 floors)
- Walk to rail: 14 min to AG1 Sentul Timur (1,134 m, OpenStreetMap route)
- Against completed resale homes in Setapak: median about RM 347 psf (42 sales)
EkoTitiwangsa scorecard
Six sub-scores from 0 to 10, each with its formula and inputs. Data-based, not a recommendation; there is no overall total.
- Price vs area: not scored — Not enough data on record. Formula: 5 − (gap % ÷ 5), kept within 0–10. Gap = this project's lowest asking psf against the median lowest asking psf of the other new launches in the same locality (needs 2 or more). Parity = 5; every 5% cheaper adds a point.
- Rail access: 5.5 / 10 — 14 min to AG1 Sentul Timur, 1134 m on foot (OSM route). Formula: 10 − (walk minutes − 5) ÷ 2, kept within 0–10. Five minutes or less = 10; 25 minutes or more = 0. Walk = measured OpenStreetMap route where one exists, otherwise straight-line × 1.3 at 80 m a minute.
- Density: 6.9 / 10 — 615 units ÷ 46 floors = 13.4 a floor; 100 of 144 other projects pack more. Formula: 10 × share of the portal's projects that put more homes on each floor (units ÷ floors). Fewer homes per floor scores higher.
- Supply pressure in area: not scored — Not enough data on record. Formula: 10 × (1 − pipeline ÷ 50%), kept within 0–10. Pipeline = condominium/apartment units under construction plus planned, as a share of the units already standing (NAPIC stock table). 0% = 10; 50% or more = 0.
- Affordability vs district income: not scored — Not enough data on record. Formula: 10 − 1.5 × (years − 3), kept within 0–10. Years = entry price ÷ (median monthly household income × 12) for the district (DOSM). Three years or less = 10.
- Developer record: not scored — Not enough data on record. Formula: 10, minus 5 for each sick project, 10 for each abandoned project and 3 for each entry on the TEDUH offence list; minus 2 when TEDUH lists fewer than 2 projects (short record). Not scored until the developer is looked up on TEDUH.
Strengths
- Trains every 3 minutes at the weekday morning peak at Sentul Timur station (GTFS Static, Prasarana via data.gov.my)
Watch-outs
- Asking range starts RM 283 psf (82%) above the median resale of completed homes in Setapak (about RM 347 psf, 42 sales) (NAPIC open transaction data)
- About 13 homes a floor (615 units over 46 floors)
Where the EkoTitiwangsa asking price sits
Asking psf midpoint RM 630, below the Kuala Lumpur new-launch median of RM 978 (68 projects on this site with an asking psf).
Completed homes resold in Setapak: NAPIC median about RM 347 psf, 42 sales in 11 schemes, 2024-01 to 2026-05. A new launch and a completed resale home are different products.
Getting around from EkoTitiwangsa
| To | Rail, door to door | Car, no traffic |
|---|---|---|
| KL City Centre | 35 min: walk 18, wait 2, train 7, 1 change, walk 4; Hospital Kuala Lumpur to KLCC | 6 min |
| TRX | 32 min: walk 18, wait 2, train 9, walk 3; Hospital Kuala Lumpur to Tun Razak Exchange | 13 min |
| Bangsar South | 49 min: walk 14, wait 1.5, train 22, 1 change, walk 6; Sentul to Kerinchi | 13 min |
| Mid Valley | 49 min: walk 14, wait 1.5, train 20, 1 change, walk 8; Sentul to Abdullah Hukum | 11 min |
| Cyberjaya | — | 38 min |
| Petaling Jaya SS2 | 75 min: walk 14, wait 1.5, train 33, 1 change, walk 21; Sentul to Taman Paramount | 18 min |
Nearest station: AG1 / SP1 Sentul Timur (Ampang Line, Sri Petaling Line); about 3,876 journeys start and 4,609 end there a day (30-day average); trains every 3 minutes at the weekday morning peak.
- Transit: AG1 SP1 Sentul Timur (0.72 km), AG2 SP2 Sentul (0.88 km), PY18 Hospital Kuala Lumpur (1.12 km)
- Schools: SJK (C) Chong Hwa 文良港中华华小 (0.11 km), SK Bandar Baru Sentul (0.28 km), Sekolah Kebangsaan Seri Perak Sentul (0.35 km)
- Shops: 99 Speedmart (0.46 km), OTK Pasaraya (1.37 km), Sunway Putra Mall (2.18 km), Kompleks Mutiara (2.39 km), Quill City Mall (2.65 km)
- Health: Hospital Tawakal (0.76 km), KPJ Tawakkal KL Specialist Hospital (0.79 km)
- Parks: Taman Tasik Titiwangsa (0.9 km), Sentul Park (1.72 km)
Rail: GTFS Static and Rapid Rail ridership via data.gov.my, walk + half the peak wait + ride + 5 minutes a change. Car: OSRM on OpenStreetMap, no traffic. Places: OpenStreetMap, straight-line distance.
The market around EkoTitiwangsa
- House price index (Kuala Lumpur, high-rise): 229.8 in 2026 Q2 (preliminary), +1.5% on 2025 Q2 (NAPIC MHPI, 2010 = 100; covers all of Kuala Lumpur)
EkoTitiwangsa against the nearest alternatives
The closest projects in the same area or within 15% of the entry price, on the same facts and the same scorecard.
| Fact | EkoTitiwangsa | BambooHill 2.9 km away, similar price | Aricia 6.9 km away, similar price | Laurel Residence 9.2 km away, similar price |
|---|---|---|---|---|
| From price | RM 434,700 | RM 486,000 | RM 461,000 | RM 450,000 |
| Asking psf | RM 630 | RM 972 | RM 779 | RM 909 |
| Built-up, sq ft | 690–1,120 | 603–904 | 550–1,420 | 495–903 |
| Tenure | Freehold | Freehold | Freehold | Leasehold |
| Completion | Under Construction 2028 | Under Construction 2029 | Under Construction 2029 | Completed 2024 |
| Units · floors | 615 · 46 | — | 787 · Tower A: 50 floors, Tower B: 47 floors | 1,260 · 42 |
| Homes per floor | about 13.4 | — | about 15.7 | about 30 |
| Walk to rail | 14 min, AG1 Sentul Timur | 5 min (estimate), PY14 Kentomen | 17 min, AG11 Chan Sow Lin | 14 min, KJ19 Universiti |
| Price vs area /10 | — | — | 4.2 | 4.0 |
| Rail access /10 | 5.5 | 10.0 | 4.0 | 5.5 |
| Density /10 | 6.9 | — | 5.3 | 1.4 |
| Supply pressure in area /10 | — | — | 7.2 | 3.7 |
| Affordability vs district income /10 | — | — | 8.9 | 9.0 |
| Developer record /10 | — | — | — | — |
| Where it wins | lowest entry price (RM 434,700); lowest asking psf (from RM 630); fewest homes per floor (13.4) | shortest walk to rail (5 min) | largest layout (1,420 sq ft) | earliest completion (2024) |
Who EkoTitiwangsa suits
- Transit commuter: Partial match (2 of 3 checks) — – 14 min walk to AG1 Sentul Timur; ✓ Trains every 3 minutes at the morning peak; ✓ 35 min door to door to KL City Centre by rail. Rule: Walk ≤ 10 min · peak train ≤ 5 min apart · rail to KL City Centre ≤ 35 min
- Own-stay family: Strong match (3 of 3 checks) — ✓ 3-bedroom layouts on the list (1+1–3); ✓ Largest layout 1,120 sq ft; ✓ 3 schools listed within a 10-minute walk. Rule: A 3-bedroom layout on record · largest home ≥ 1,000 sq ft · a school within a 10-minute walk
- First-home buyer: Weak match (1 of 3 checks) — – District income not on record; ✓ Smallest layout 690 sq ft, from RM 434,700; – Rail 14 min on foot. Rule: Entry price ≤ 5 years of district median income · smallest home ≤ 700 sq ft · walk to rail ≤ 10 min
- Rental investor: Weak match (1 of 3 checks) — – 14 min walk to rail; ✓ 1-bedroom layouts on the list; – Area supply not on record. Rule: Walk to rail ≤ 10 min · 1-bedroom layouts on record · incoming + planned supply < 20% of stock. Rental figures are not on record.
A match is a fit with the numbers, not advice to buy.
Who EkoTitiwangsa may not suit
- Buyers who must move in before 2028 — completion is expected in 2028; a buyer who signs now needs somewhere else to live for about 2 years.
EkoTitiwangsa: checked facts
Analysis built 2026-10-30 from the figures on this page and public data: NAPIC, DOSM via data.gov.my, KPKT TEDUH, GTFS Static and Rapid Rail ridership via data.gov.my, OpenStreetMap and OSRM. Asking prices are not valuations.
Can foreigners buy EkoTitiwangsa?
In Kuala Lumpur, a unit has to cost RM 1,000,000 or more before a foreign buyer can take it. EkoTitiwangsa is listed at RM 434,700 – RM 739,600, below that minimum on the prices on record. Price is only the first test: every foreign purchase needs consent from the land authority.
Costs on top of the EkoTitiwangsa price
| Item | On the RM 434,700 starting price |
|---|---|
| Transfer stamp duty, Malaysian buyer | RM 7,694 (1% on the first RM100,000, 2% up to RM500,000, 3% up to RM1,000,000, 4% above). |
| Transfer stamp duty, foreign buyer | 8% flat; no listed unit reaches the RM 1,000,000 foreign-buyer minimum (flat 8% on residential property from 1 January 2026, for non-citizens and foreign companies; permanent residents pay the Malaysian rate) |
| Loan agreement stamp duty | 0.5% of your loan |
| Legal fees | Bought from a licensed developer: 70% of the standard scale at this price (standard: 1.25% on the first RM500,000, 1% on the next RM7,000,000), a share fixed by Table B of the Solicitors' Remuneration Order 2023; plus 8% service tax |
EkoTitiwangsa starts below RM500,000. The first-home stamp duty exemption (market value up to RM500,000, sale and purchase agreements signed from 1 January 2021 to 31 December 2027) is written for homes: LHDN's declaration form leaves out serviced apartments and SOHOs, while the Finance Act counts them as homes; the Malaysian Bar raised this with LHDN (circular 128/2026).
EkoTitiwangsa compared with other Kuala Lumpur projects
This site has no other priced project in the same area, so the table lists the Kuala Lumpur projects on this site whose starting price is closest to EkoTitiwangsa's. Projects outside the area sit in different neighbourhoods, so location, access and surroundings will differ.
Among these 6 projects, EkoTitiwangsa has the 2nd lowest entry price per sq ft, at RM 630.
| Project | Starting price | Entry price per sq ft | Sizes (sq ft) | Completion |
|---|---|---|---|---|
| EkoTitiwangsa | RM 434,700 | RM 630 | 690–1,120 | 2028 |
| Riverville Residences 2 | RM 430,000 | RM 535 | 803–915 | Target Q3 2027 |
| The Vividz | RM 446,400 | RM 922 | 484–915 | 52 months after APDL (~2030) |
| The Kingswoodz @ Bukit Jalil | RM 422,500 | RM 891 | 474–904 | 2028 (52 months from SPA) |
| Arte Star Sungai Besi - Arte Star Milano | RM 422,000 | RM 801 | 527–1,185 | 2029 |
| Ambience Residence | RM 448,230 | RM 670 | 669–1,080 | 2027 |
Entry price per sq ft = starting price ÷ built-up of the smallest layout; bigger layouts and higher floors give other figures.
Frequently asked questions about EkoTitiwangsa
How much is EkoTitiwangsa?
List prices run RM 434,700–RM 739,600. A new release can carry different prices, so the latest price list is the one that counts.
What tenure and land title does EkoTitiwangsa have?
Freehold, Commercial (Block B & C serviced apartments); Block A office suites: Commercial title, sold under the Housing Development Act. Developer: Ekovest Berhad (Ekovest Land Sdn Bhd).
Which unit sizes does EkoTitiwangsa offer?
690–1,120 sq ft, 1+1–3 bedrooms.
How many homes are in EkoTitiwangsa?
615 units over 46 floors.
When is EkoTitiwangsa due for completion?
Completion is expected in 2028 (under construction).
How do I get the EkoTitiwangsa price list and floor plans?
Message Yee Woei Shyan (REN 46305, IQI Realty Sdn Bhd) on WhatsApp at +60 10-827 8932; the current price list, floor plans and a sales gallery slot are sent there.
Enquiries and sales gallery appointments: Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd. WhatsApp +60 10-827 8932.
All residences · Compare projects · Buying guide · Loan calculator