Celestz @ Kebun Teh
Celestz @ Kebun Teh by EXSIM KEBUN TEH SDN BHD in Kebun Teh, Johor. From RM 543,800, Leasehold High-Rise Residential with 581-915 sqft layouts (1+1–3 bedrooms). Floor plans, distance to the nearest stations and sales gallery appointments on propertyportal.my.
Celestz @ Kebun Teh project information
| Developer | EXSIM KEBUN TEH SDN BHD |
|---|---|
| Location | Jalan Kebun Teh, Johor Bahru, Johor |
| Property type | High-Rise Residential |
| Tenure | Leasehold |
| Land title | Commercial under HDA |
| Starting price | RM 543,800 |
| Price range | RM 543,800 – RM 889,100 |
| Built-up | 581-915 sqft |
| Bedrooms | 1+1–3 bedrooms |
| Total units | 735 |
| Blocks / floors | 44 Storeys (LG + G + 42 Storeys) floors |
| Maintenance fee | RM0.51 psf (Including sinking fund) |
| Completion | New Launch, 2031 |
Celestz @ Kebun Teh at a glance
- From price: RM 543,800 to RM 889,100
- Asking psf: RM 936 per sq ft
- Tenure: Leasehold
- Completion: expected 2031
- Units: 735, 44 floors, 1+1–3 bedrooms
- Density: about 17 homes a floor (735 units ÷ 44 floors)
Celestz @ Kebun Teh scorecard
Six sub-scores from 0 to 10, each with its formula and inputs. Data-based, not a recommendation; there is no overall total.
- Price vs area: not scored — Not enough data on record. Formula: 5 − (gap % ÷ 5), kept within 0–10. Gap = this project's lowest asking psf against the median lowest asking psf of the other new launches in the same locality (needs 2 or more). Parity = 5; every 5% cheaper adds a point.
- Rail access: not scored — Not scored for this area (rail data covers the Klang Valley only). Formula: 10 − (walk minutes − 5) ÷ 2, kept within 0–10. Five minutes or less = 10; 25 minutes or more = 0. Walk = measured OpenStreetMap route where one exists, otherwise straight-line × 1.3 at 80 m a minute.
- Density: 5.1 / 10 — 735 units ÷ 44 floors = 16.7 a floor; 74 of 144 other projects pack more. Formula: 10 × share of the portal's projects that put more homes on each floor (units ÷ floors). Fewer homes per floor scores higher.
- Supply pressure in area: not scored — Not enough data on record. Formula: 10 × (1 − pipeline ÷ 50%), kept within 0–10. Pipeline = condominium/apartment units under construction plus planned, as a share of the units already standing (NAPIC stock table). 0% = 10; 50% or more = 0.
- Affordability vs district income: not scored — Not enough data on record. Formula: 10 − 1.5 × (years − 3), kept within 0–10. Years = entry price ÷ (median monthly household income × 12) for the district (DOSM). Three years or less = 10.
- Developer record: not scored — Not enough data on record. Formula: 10, minus 5 for each sick project, 10 for each abandoned project and 3 for each entry on the TEDUH offence list; minus 2 when TEDUH lists fewer than 2 projects (short record). Not scored until the developer is looked up on TEDUH.
Watch-outs
- About 17 homes a floor (735 units over 44 floors)
Where the Celestz @ Kebun Teh asking price sits
Asking psf midpoint RM 936, below the Johor new-launch median of RM 1,360 (16 projects on this site with an asking psf).
| Project | Lowest psf | Highest psf |
|---|---|---|
| The Asteriaz | RM 841 | RM 841 |
| Celestz @ Kebun Teh | RM 936 | RM 936 |
Celestz @ Kebun Teh against the nearest alternatives
The closest projects in the same area or within 15% of the entry price, on the same facts and the same scorecard.
| Fact | Celestz @ Kebun Teh | The Asteriaz 0.1 km away, same area | Axis, Causewayz Square 3.1 km away, similar price | GEN RISE 3.2 km away, similar price |
|---|---|---|---|---|
| From price | RM 543,800 | RM 474,900 | RM 580,300 | RM 563,000 |
| Asking psf | RM 936 | RM 841 | RM 1,536 | RM 1,108–1,346 |
| Built-up, sq ft | 581–915 | 560–915 | 366–592 | 497–1,930 |
| Tenure | Leasehold | Leasehold | Freehold | Freehold |
| Completion | New Launch 2031 | New Launch 2029 | New Launch 2030 | New Launch 2029 |
| Units · floors | 735 · 44 Storeys (LG + G + 42 Storeys) | 848 · 42 | 908 · 62 | 732 · 47+1 Basement |
| Homes per floor | about 16.7 | about 20.2 | about 14.6 | about 15.6 |
| Walk to rail | — | — | — | — |
| Price vs area /10 | — | — | 2.8 | 10.0 |
| Rail access /10 | — | — | — | — |
| Density /10 | 5.1 | 3.5 | 6.1 | 5.5 |
| Supply pressure in area /10 | — | — | — | 7.7 |
| Affordability vs district income /10 | — | — | — | 6.7 |
| Developer record /10 | — | — | — | — |
| Where it wins | — | lowest entry price (RM 474,900); lowest asking psf (from RM 841); earliest completion (2029) | fewest homes per floor (14.6) | largest layout (1,930 sq ft); earliest completion (2029) |
Who Celestz @ Kebun Teh suits
- Transit commuter: Not scored for this area (rail data covers the Klang Valley only)
- Own-stay family: Weak match (1 of 3 checks) — ✓ 3-bedroom layouts on the list (1+1–3); – Largest layout 915 sq ft; – 0 schools listed within a 10-minute walk. Rule: A 3-bedroom layout on record · largest home ≥ 1,000 sq ft · a school within a 10-minute walk
- First-home buyer: Partial match (1 of 2 checks) — – District income not on record; ✓ Smallest layout 581 sq ft, from RM 543,800; Not scored for this area (rail checks cover the Klang Valley only). Rule: Entry price ≤ 5 years of district median income · smallest home ≤ 700 sq ft · walk to rail ≤ 10 min
- Rental investor: Partial match (1 of 2 checks) — Not scored for this area (rail checks cover the Klang Valley only); ✓ 1-bedroom layouts on the list; – Area supply not on record. Rule: Walk to rail ≤ 10 min · 1-bedroom layouts on record · incoming + planned supply < 20% of stock. Rental figures are not on record.
A match is a fit with the numbers, not advice to buy.
Who Celestz @ Kebun Teh may not suit
- Buyers who must move in before 2031 — completion is expected in 2031; a buyer who signs now needs somewhere else to live for about 5 years.
Celestz @ Kebun Teh: checked facts
Analysis built 2026-10-30 from the figures on this page and public data: NAPIC, DOSM via data.gov.my, KPKT TEDUH, GTFS Static and Rapid Rail ridership via data.gov.my, OpenStreetMap and OSRM. Asking prices are not valuations.
Can foreigners buy Celestz @ Kebun Teh?
Foreign buyers in Johor can buy only at RM 1,000,000 or more per unit (plus a state consent fee of 3% of the price or RM30,000, whichever is higher, and an RM2,000 application fee per title). Celestz @ Kebun Teh is listed at RM 543,800 – RM 889,100, below that minimum on the prices on record. Because Celestz @ Kebun Teh is on commercial title, a unit below RM1,000,000 can still be sold to a foreign buyer when it is bought from the developer and the Johor State Authority approves that sale; the consent fee is then at least RM50,000. Resale units below RM1,000,000 do not have this route. Price is only the first test: every foreign purchase needs State Authority approval, Bumiputera-quota units are closed to foreign buyers, and foreign ownership in an apartment project is capped at 50% of its units.
Costs on top of the Celestz @ Kebun Teh price
| Item | On the RM 543,800 starting price |
|---|---|
| Transfer stamp duty, Malaysian buyer | RM 10,314 (1% on the first RM100,000, 2% up to RM500,000, 3% up to RM1,000,000, 4% above). |
| Transfer stamp duty, foreign buyer | RM 43,504 (only through the developer route with State Authority approval described above) (flat 8% on residential property from 1 January 2026, for non-citizens and foreign companies; permanent residents pay the Malaysian rate) |
| Loan agreement stamp duty | 0.5% of your loan |
| Legal fees | Bought from a licensed developer: 65% of the standard scale at this price (standard: 1.25% on the first RM500,000, 1% on the next RM7,000,000), a share fixed by Table B of the Solicitors' Remuneration Order 2023; plus 8% service tax |
Celestz @ Kebun Teh monthly maintenance fee
The stated rate is RM0.51 psf (Including sinking fund). On the 581 sq ft unit that is about RM 296 a month, and about RM 467 on the 915 sq ft unit.
Celestz @ Kebun Teh compared with other Johor projects
This site has no other priced project in the same area, so the table lists the Johor projects on this site whose starting price is closest to Celestz @ Kebun Teh's. Projects outside the area sit in different neighbourhoods, so location, access and surroundings will differ.
Among these 6 projects, Celestz @ Kebun Teh has the 2nd lowest entry price per sq ft, at RM 936.
| Project | Starting price | Entry price per sq ft | Sizes (sq ft) | Completion |
|---|---|---|---|---|
| Celestz @ Kebun Teh | RM 543,800 | RM 936 | 581–915 | 2031 |
| GEN RISE | RM 563,000 | RM 1,133 | 497–1,930 | 2029 |
| Axis, Causewayz Square | RM 580,300 | RM 1,586 | 366–592 | TBC |
| Gen Sphere | RM 609,000 | RM 1,327 | 459–755 | 2029 |
| The Asteriaz | RM 474,900 | RM 848 | 560–915 | TBC |
| Coronade Twins | RM 450,000 | RM 1,607 | 280–1,230 | 2030 |
Entry price per sq ft = starting price ÷ built-up of the smallest layout; bigger layouts and higher floors give other figures.
Frequently asked questions about Celestz @ Kebun Teh
How much is Celestz @ Kebun Teh?
List prices run RM 543,800–RM 889,100. A new release can carry different prices, so the latest price list is the one that counts.
What tenure and land title does Celestz @ Kebun Teh have?
Leasehold, Commercial title, sold under the Housing Development Act. Developer: EXSIM KEBUN TEH SDN BHD.
Which unit sizes does Celestz @ Kebun Teh offer?
581–915 sq ft, 1+1–3 bedrooms.
How many homes are in Celestz @ Kebun Teh?
735 units.
When is Celestz @ Kebun Teh due for completion?
Completion is expected in 2031 (new launch).
What will maintenance cost at Celestz @ Kebun Teh?
RM 0.51 a sq ft each month, sinking fund included. For the smallest 581 sq ft unit that comes to about RM 296 a month.
How do I get the Celestz @ Kebun Teh price list and floor plans?
Message Yee Woei Shyan (REN 46305, IQI Realty Sdn Bhd) on WhatsApp at +60 10-827 8932; the current price list, floor plans and a sales gallery slot are sent there.
Enquiries and sales gallery appointments: Yee Woei Shyan, REN 46305, IQI Realty Sdn Bhd. WhatsApp +60 10-827 8932.
All residences · Compare projects · Buying guide · Loan calculator